Sediment & Waterfront Remediation
MGP, sediment, and engineered cover programs delivered end-to-end.
Remedial delivery for MGP sites, contaminated sediments, and legacy waterfront properties across NJ and NY — with a project record spanning Harrison MGP, BICC Cables sediment, and the Nuodex geomembrane-lined wetlands.
How a cleanup runs
From delineation through the regulator's sign-off letter.
- 01
Scope & kickoff
Same-business-day scope, fee range and delivery date.
Request a scope - 02
Field work & closure
Oversight, documentation and the closure letter on file.
Read the FAQs - 03
Common next step
The work most clients authorize once this closes out.
Soil Disposal Certification - 04
Start the engagement
Send the site details — we scope it and price it.
Start the engagement
Why Waterfront Sites Are Different
Multi-Agency Jurisdiction
Sediment and MGP work intersects NJDEP / NYSDEC, USACE, NYCDEP, and often FEMA and state historic preservation offices. Sequencing permits wrong adds a season to schedule.
Legacy NAPL & Coal Tar
MGP and legacy waterfront sites carry residual NAPL, coal tar, and PAH impacts that behave differently than dissolved-phase contaminants. Remedial design has to reflect that.
Long-Term Performance
Engineered caps and cover systems live for decades. Cap design, monitoring, and O&M planning must be built for hydrodynamic, settlement, and climate-adaptation realities.
Sediment & Waterfront Capabilities
MGP remediation, sediment investigation and cap design, and engineered cover systems — delivered under one LSRP-led team.
MGP & Legacy Waterfront Site Remediation
Utility owners, redevelopers, and public agencies inheriting former MGP or legacy waterfront industrial sites requiring defensible closure pathways.
Full remedial delivery for former Manufactured Gas Plant (MGP) sites and legacy waterfront properties. Envicon personnel have supported the Harrison MGP / PATH Substation IRM and comparable programs, coordinating with NJDEP, NYSDEC, and utility owners on interim remedial measures and long-term closure.
What's Included
- Remedial investigation & feasibility study
- Interim Remedial Measure (IRM) design
- NAPL and coal tar characterization
- Contractor procurement & construction oversight
- NJDEP / NYSDEC / LSRP correspondence
- Institutional & engineering controls
Sediment Investigation & Cap Design
Utilities, port authorities, and industrial owners managing contaminated sediments in tidal waterways, harbors, or industrial canals.
Sediment investigation, bench-scale testing, and engineered cap design for contaminated waterways and marine sites. Track record includes the BICC Cables DCU Area 2B sediment remediation. Designs coordinate with USACE, NJDEP, NYSDEC, and NYCDEP dredging and disposal permitting.
What's Included
- Sediment sampling & bathymetric survey
- Bench-scale bioavailability & leachability testing
- Reactive & armored cap design
- USACE Section 404/10 permitting
- Turbidity & CAMP monitoring plans
- Dredge material management strategy
Geomembrane & Engineered Cover Design
Owners of landfill closures, lined wetlands, and legacy fill sites requiring engineered cover systems for CEA, deed-notice, or SMP compliance.
Geomembrane liner and engineered cover design for lined wetlands, landfill caps, and legacy fill sites. Envicon delivered the Former Nuodex Geomembrane-Lined Wetlands Pond and comparable engineered cover systems that meet NJDEP and NYSDEC long-term performance criteria.
What's Included
- Cover system alternatives analysis
- Geosynthetic clay liner & HDPE geomembrane spec
- Vegetative & armored cover layering
- Slope stability & settlement analysis
- CQA plan & third-party CQA support
- Long-term monitoring & O&M manual
MGP & Waterfront Track Record
Envicon personnel have delivered the Harrison MGP / PATH Substation IRM, BICC Cables sediment remediation, and the Former Nuodex Geomembrane-Lined Wetlands Pond — coordinating utility owners, USACE, and state regulators through construction and long-term monitoring.
Sediment & Waterfront Remediation Brief
MGP, Sediment, & Engineered Cover Programs
How Envicon delivers MGP, sediment, and geomembrane cover programs — from investigation through USACE-permitted construction.
Get Instant Access
Frequently Asked Questions
Transparent pricing for Sediment & Waterfront Remediation — get your site-specific estimate
Answer a few questions about your property and get a real price range in under 2 minutes. No sales call required.
- Site-specific range
- Under 2 minutes
- No obligation
- Emailed to you
Preliminary estimate only. Not an engineering quote.
Service inquiry form
Request a Free Project Consultation
Tell us about your property and we'll respond with a tailored scope and pricing within 2 business hours.
Tell us about your site
A licensed engineer will get back to you the same business day.
Related Remediation & Brownfield Services
Projects rarely need one service in isolation. These are the scopes most often paired with this one.
Services That Work Alongside Sediment & Waterfront Remediation
Scopes our clients most often add to keep one schedule, one regulator conversation, and one point of accountability.
Industries That Rely on Sediment & Waterfront Remediation
See how teams across these sectors integrate sediment & waterfront remediation into their projects, with regulator-ready deliverables and predictable timelines.
Public Agencies
From on-call task orders to major capital projects, we help municipalities and public agencies deliver infrastructure that serves communities.
Utilities
From capital improvement projects to regulatory compliance, we help utilities deliver reliable service while meeting environmental obligations.
Developers
We understand your timeline pressures. Get Phase I ESAs that pass lender scrutiny the first time, with 1-week turnaround when you need it.
Industrial
Whether you're acquiring, developing, or operating industrial facilities, we provide the environmental expertise to protect your investment.
Law Firms
We provide environmental law firms with the technical analysis, expert opinions, and litigation support needed to build winning arguments.
Sediment & Waterfront Remediation Across the NY/NJ Metro Area
Licensed teams working locally — pick your market for regional regulators, turnaround times, and recent project work.
