Survey, subsurface, environmental, and design data in one coordinated model — so conflicts surface in review, not in the ground.

  • 100% lender approval on Phase I ESAs
  • 1-week priority Phase I turnaround
  • Fixed-fee, same-day quotes

Free scoping call — fixed-fee quote with the scope locked before we start.

From survey to a buildable, coordinated deliverable

Every project runs the same digital spine. The point is not the software — it is that one dataset carries from field capture through design, construction, and closeout.

  1. 1

    Capture existing conditions

    Drone photogrammetry, LiDAR scanning, and conventional survey produce a dense point cloud of what is actually on the site today — grades, structures, pavement, and utility appurtenances.

    See the underlying service
  2. 2

    Model what's below grade

    Boring logs, ground-penetrating radar findings, utility records, and contamination extents are brought into the same coordinate system, so subsurface risk is visible during design instead of during excavation.

    See the underlying service
  3. 3

    Build the design model

    Civil 3D surfaces, corridors, and grading design are built directly off the existing-conditions surface, with earthwork quantities produced from the model rather than estimated from sections.

    See the underlying service
  4. 4

    Federate and clash-check

    Civil, structural, and MEP models are assembled in Navisworks and run for clashes, with a tracked resolution log carried through design completion.

    See the underlying service
  5. 5

    Deliver and maintain as-builts

    Machine-control-ready surfaces for the contractor, quantity reports for estimating, and an updated as-built model at closeout for long-term facility and compliance management.

    See the underlying service

Have survey, scan, or legacy 2D files?

Send them over and we'll tell you what it takes to get a coordinated model your whole team can build from.

Not ready for a full form?

One email with the scope and range. No obligation, no drip sequence.

What it changes on a real project

Design-stage
Conflict resolution

A utility clash caught in a coordination run costs engineering hours. The same clash found during excavation costs a change order and schedule days.

Model-based
Earthwork quantities

Cut/fill and disposal volumes come from the surface model, so soil-disposal budgeting starts from measured volumes instead of allowances.

1–2 weeks
Model setup

Typical turnaround to stand up a coordinated Civil 3D environment from existing survey, scan, or legacy 2D design files.

One dataset
Environmental + civil

Remedy limits, cap boundaries, and engineering controls sit in the same model as the civil design, so excavation planning respects the remedy.

Deliverables your reviewers and contractors can use

  • Autodesk Civil 3D, Revit, and Navisworks native files
  • IFC exports and machine-control surfaces for contractors
  • Point clouds and existing-conditions surfaces from field capture
  • Earthwork and quantity reports tied to the model, not to sections
  • Tracked clash-resolution logs through design completion
  • As-built model handover at closeout for facility management

Service inquiry form

Scope a coordinated model for your project

Tell us the project, the software your team uses, and what stage the design is in. We'll return a modeling scope.

Project location

Type at least three characters to see address suggestions, then use the arrow keys to choose one.

Your information is confidential and routed only to our licensed project team.

Protected by reCAPTCHA — this site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Ready to put your project in one model?

Share the survey, scan, or design files you have and we'll scope the coordination work and the deliverable format your team needs.