Skip to main content
Envicon Group
10 Business Days Standard
ASTM E1527-21 / 40 CFR 312
Lender & Counsel Accepted

Phase I Environmental Site Assessment
ASTM E1527-21 · AAI-Compliant Due Diligence

ASTM E1527-21 Phase I Environmental Site Assessments that satisfy All Appropriate Inquiries and hold up with lenders, counsel, and agencies. Records review, site reconnaissance, interviews, and a defensible REC determination.

  • 100% lender approval on Phase I ESAs
  • 1-week priority Phase I turnaround
  • Fixed-fee, same-day quotes

Free scoping call — fixed-fee quote with the scope locked before we start.

What Is a Phase 1 Environmental Site Assessment?

A Phase I Environmental Site Assessment is a records review, site visit and set of interviews that identifies recognized environmental conditions on a property. Performed to ASTM E1527-21, it satisfies EPA All Appropriate Inquiries (40 CFR Part 312), which buyers need for CERCLA liability protection and lenders require before closing.

What's Included in an Envicon Phase I ESA Engagement

Historical Records & Regulatory Database Review

Sanborn maps, aerial photography, city directories, topographic maps, and a full federal/state/tribal database radius search with data-gap documentation.

Site Reconnaissance & Interviews

Walk-through of the subject property and adjoining land uses, plus owner, occupant, and local-agency interviews performed by the Environmental Professional of record.

REC / HREC / CREC Determination

Clear identification and classification of recognized environmental conditions with the reasoning that supports each finding — not a hedge-everything report.

Phase II Scoping Recommendations

Where RECs are identified, a scoped and budgeted subsurface investigation path so you can price the next step before you close.

What a Phase I ESA Does Not Cover

Knowing the boundary up front avoids surprises at closing. Each item can be quoted as an add-on.

  • Soil, groundwater or soil-gas sampling

    A Phase I is non-intrusive. Sampling belongs to a Phase II, scoped only when the Phase I finds a REC.

  • Asbestos, lead paint, mold and radon

    Non-scope considerations under ASTM E1527-21. We add them as separate line items when the deal needs them.

  • Wetlands, endangered species and cultural resources

    Also non-scope under the standard; quoted separately where a lender or permit requires them.

  • Building condition

    Roof, structure and systems are covered by a Property Condition Report (ASTM E2018), not the Phase I.

When You Need a Phase I ESA

  • Acquiring or refinancing commercial or industrial property
  • Lender or SBA loan condition prior to closing
  • Establishing CERCLA landowner liability protections
  • Leasing an industrial site with unknown prior operations
  • Portfolio due diligence across multiple assets
  • A prior Phase I is more than 180 days old

Need Phase I ESA on a deadline?

Tell us the site and the driver and we'll come back with a Phase I Environmental Site Assessment scope, a price range, and a delivery date — usually the same business day.

Not ready for a full form?

One email with the scope and range. No obligation, no drip sequence.

Lenders & transaction teams

Closing a deal that needs Phase I Environmental Site Assessment?

Tell us where you sit in the transaction and when it closes. We route your request straight to the team that handles Phase I Environmental Site Assessment and come back with a fixed-fee scope and a schedule built around your closing date.

  • Lender-ready, ASTM-conformant deliverables
  • Scope and fee back within one business day
  • Rush scheduling for closings inside two weeks

Prefer to talk it through? (917) 764-2171

No obligation. We use your email only to send the scope and fee for this request.

Environmental Due Diligence

Choose Your Level of Protection

Service comparison — not a formal proposal

Four levels of due-diligence coverage for NY and NJ property transactions — from a fast desktop read to a pre-closing subsurface investigation. Each level buys you a different amount of liability protection.

Protection: Entry

Desktop Review

Protection strength 1 of 4 — Entry.

A fast go/no-go read before you commit. No field visit, and it does not meet the ASTM standard.

from $850

flat fee

Draft in 3-5 business days

You are here

Protection: Standard

Phase I ESA

Protection strength 2 of 4 — Standard.

The standard. Meets ASTM E1527-21 with a site visit and a report signed by an Environmental Professional.

from $2,200

lump sum

Draft in 2-3 weeks

Recommended

Protection: Full

Phase I + Transfer Screen + Lien Search

Protection strength 3 of 4 — Full.

Full Phase I, the state transfer-trigger answer you need before closing, and a hidden-lien check.

from $3,850

lump sum

Draft in 2-3 weeks

See what Phase I + Transfer Screen + Lien Search covers

Protection: Maximum

All-In

Protection strength 4 of 4 — Maximum.

Everything above, plus a limited Phase II before you close. Phase II scope is set by what the Phase I finds.

from $9,850

Phase II priced on findings

Draft in 3-4 weeks

See what All-In covers

Not sure which level you need?

Get a tailored recommendation for your deal.

Tell us the level you're weighing and where to send it. An Environmental Professional reviews your situation and emails back whether that scope actually covers your liability — or whether you're buying more (or less) than you need. No obligation.

One email with your recommendation. No newsletter, no sales sequence.

Every property prices differently.

These are starting points. Acreage, prior use, region and how fast you need it all move the number. The Cost Estimator gives you a range built around your property, your service and your closing date — in under two minutes, no obligation.

Compare the levels side by side

Select a level to highlight it and flag what that upgrade adds. Every line links to the service that delivers it.

Starting prices are floors for a typical NY/NJ commercial property and are not a quote. A Desktop Review does not meet ASTM E1527-21 and confers no All Appropriate Inquiries protection. Additional scopes are provided for information only and are not initiated without separate written authorization.

Transparent pricing for Phase I ESA — get your site-specific estimate

Answer a few questions about your property and get a real price range in under 2 minutes. No sales call required.

  • Site-specific range
  • Under 2 minutes
  • No obligation
  • Emailed to you

Preliminary estimate only. Not an engineering quote.

Service inquiry form

Request a Phase I ESA Quote

Send us the address, transaction date, and lender requirements. We'll return a fixed fee and a delivery date within 2 business hours.

Project location

Type at least three characters to see address suggestions, then use the arrow keys to choose one.

Your information is confidential and routed only to our licensed project team.

Protected by reCAPTCHA — this site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

FAQ

Phase I ESA FAQs

Common questions from buyers, lenders, and counsel scoping environmental due diligence.

Ready to move on Phase I ESA?

Send us the site details and we'll scope it, price it, and tell you honestly whether you need this work at all.

Call Now