Geotechnical Investigation Services
Borings · Lab Testing · Foundation Design
Subsurface investigation and PE-signed foundation recommendations for developers, contractors, and architects across NJ, NY, and PA. Drilling, in-situ testing, laboratory analysis, and construction-phase support — delivered on the schedules lenders and permit desks actually need.
How the engineering runs
Investigation, analysis, sealed drawings, construction support.
- 01
Scope & kickoff
Same-business-day scope, fee range and delivery date.
Request a scope - 02
Construction support
RFIs, submittals and field verification through closeout.
Read the FAQs - 03
Common next step
The work most clients authorize once this closes out.
Dewatering Design - 04
Start the engagement
Send the site details — we scope it and price it.
Start the engagement
Full-Scope Geotechnical Engineering
Soil Borings & Sampling
Standard Penetration Test (SPT) borings, undisturbed Shelby-tube samples, and rock coring across the site footprint, coordinated with utility mark-outs and access constraints.
Geotechnical Lab Testing
AASHTO- and ASTM-compliant lab suite: gradation, Atterberg limits, moisture/density, consolidation, direct shear, triaxial, and CBR testing as scope demands.
Foundation & Retaining Wall Recommendations
Shallow-foundation bearing capacity, deep-foundation options (driven piles, drilled piers, micropiles), lateral earth pressures, and settlement analysis in a signed & sealed report.
Construction-Phase Support
Pre-bid geotechnical clarifications, RFI response during construction, and field observation of subgrade preparation, deep-foundation installation, and compaction.
Typical Project Types
- New commercial, residential, and mixed-use developments
- Building additions, vertical expansions, and reroofs
- Retaining walls, excavations, and SOE design
- Bridge, culvert, and pavement subgrade evaluations
- Deep-foundation and pile-driving programs
- Post-construction settlement and distress investigations
Pairs Naturally With

Phase II ESA
Combine environmental sampling with geotechnical borings in a single mobilization — typical savings of 20–30%.
Explore service
Dewatering Design
Groundwater elevations from the boring program feed directly into dewatering system design and NJPDES permitting.
Explore service
Structural Engineering
Foundation recommendations flow directly into our structural team's design of pile caps, mats, and grade beams.
Explore serviceGeotechnical Investigation FAQs
Common questions from developers, contractors, and architects scoping subsurface investigation work.
Transparent pricing for Geotechnical Investigation — get your site-specific estimate
Answer a few questions about your property and get a real price range in under 2 minutes. No sales call required.
- Site-specific range
- Under 2 minutes
- No obligation
- Emailed to you
Preliminary estimate only. Not an engineering quote.
Service inquiry form
Request a Free Project Consultation
Tell us about your property and we'll respond with a tailored scope and pricing within 2 business hours.
Related Civil & Geotechnical Services
Projects rarely need one service in isolation. These are the scopes most often paired with this one.

Dewatering Design & Permitting
Construction dewatering system design, permitting, and field oversight for NJ and NY sites.
Learn more
Construction Oversight & Field Engineering
On-site field engineering, QA/QC, and construction administration for NJ and NY projects.
Learn more
NJ Structural Integrity Law Inspections (S.2760)
NJ S.2760 Structural Integrity Law inspections for condominium and co-op associations.
Learn more
Structural & Transportation Engineering
Structural and transportation engineering for bridge, highway, and transit assets.
Learn more
Reserve Studies
Reserve studies for NY and NJ condominiums, co-ops, and HOAs.
Learn more
Flood Resilience & Climate Adaptation
Flood risk mitigation, resilient design, and climate adaptation planning.
Learn moreServices That Work Alongside Geotechnical Investigation
Scopes our clients most often add to keep one schedule, one regulator conversation, and one point of accountability.

Ground Penetrating Radar (GPR) Survey
Non-destructive subsurface utility, tank, and structural GPR investigations.
Learn more
Phase II Environmental Site Assessment
Subsurface investigation of soil, groundwater, and soil gas to NJDEP and NYSDEC protocols following a Phase I REC.
Learn more
Construction Oversight & Field Engineering
On-site field engineering, QA/QC, and construction administration for NJ and NY projects.
Learn moreIndustries That Rely on Geotechnical Investigation
See how teams across these sectors integrate geotechnical investigation into their projects, with regulator-ready deliverables and predictable timelines.

Developers
We understand your timeline pressures. Get Phase I ESAs that pass lender scrutiny the first time, with 1-week turnaround when you need it.
Explore industry
Contractors
From pre-bid geotechnical data to construction-phase environmental monitoring, we help contractors deliver projects on time and within compliance.
Explore industry
Public Agencies
From on-call task orders to major capital projects, we help municipalities and public agencies deliver infrastructure that serves communities.
Explore industry
Institutional
Hospitals, universities, and nonprofits face unique environmental challenges. We help you protect your community while managing complex property portfolios.
Explore industry
Architects
We provide the environmental and geotechnical intelligence architects need to design with confidence, from site analysis through construction.
Explore industryGeotechnical Investigation Across the NY/NJ Metro Area
Licensed teams working locally — pick your market for regional regulators, turnaround times, and recent project work.


