
Health & Safety Plans (HASP)
HAZWOPER Compliance & Field Safety Oversight
The plan that keeps crews safe and the job moving: hazard analysis, PPE levels, air monitoring action levels, and emergency response written for the actual site rather than pulled off a template.
- 100% lender approval on Phase I ESAs
- 1-week priority Phase I turnaround
- Fixed-fee, same-day quotes
Free scoping call — fixed-fee quote with the scope locked before we start.
How a permit runs
Applicability, application, agency review, permit in hand.
- 01
Scope & kickoff
Same-business-day scope, fee range and delivery date.
Request a scope - 02
Applicability review
What you actually need — and what you can skip.
See what's included - 03
Application package
Calculations, drawings and forms assembled to agency format.
When it applies - 04
Agency review
We answer the deficiency letters, not you.
Read the FAQs - 05
Common next step
The work most clients authorize once this closes out.
Community Air Monitoring - 06
Start the engagement
Send the site details — we scope it and price it.
Start the engagement
What's Included in an Envicon Health & Safety Plans Engagement
Site-Specific HASP Preparation
Job hazard analysis, chemical and physical hazard inventory, PPE levels by task, decontamination procedures, and site control zones keyed to the known contaminants of concern.
Air Monitoring & Action Levels
Real-time monitoring plans with defined instrument settings, action levels, and work-stoppage triggers, coordinated with community air monitoring where a CAMP applies.
Emergency Response & Hospital Routing
Emergency contacts, evacuation routes, spill response, and mapped hospital routing, with the notification chain the agency and owner both expect.
Field Safety Oversight & Training Verification
Site safety officer coverage, daily tailgate documentation, and verification that HAZWOPER 40-hour, refresher, and medical surveillance records are current for everyone on site.
When a HASP Is Required
- Intrusive investigation or remediation is planned at a known contaminated site
- A contract or agency work plan requires a site-specific HASP before mobilization
- Excavation, drilling, or confined-space entry is part of the scope
- Workers may contact impacted soil, groundwater, or vapors
- An owner needs independent verification that HAZWOPER training records are current
Mobilizing soon and still without a HASP?
Field work can't start without one, and a generic template won't satisfy an agency or a prime contractor. Tell us the site, the scope, and the contaminants and we'll return a site-specific HASP scope and schedule — typically 3 to 5 days to delivery.
Pairs Naturally With

Community Air Monitoring
Perimeter monitoring that runs alongside on-site worker protection.
Explore service
Construction Oversight
Field oversight that enforces the HASP during active work.
Explore service
Asbestos & Lead Survey
Building material hazards that change PPE and work procedures.
Explore serviceHealth & Safety Plans Past Performance
Representative projects from our NY/NJ portfolio.

BICC Cables Site DCU Area 2B Sediment Remediation
Innovative sediment remediation for a 17-acre Hudson River waterfront site under the NYSDEC Brownfield Cleanup Program, resolving PCB contamination after six previous unsuccessful remediation attempts.
View Case Study
Woodbridge Energy Center Brownfields Redevelopment
Brownfield site redevelopment of a former chemical manufacturing facility along the Raritan River, supporting construction of a new gas-fired power plant through comprehensive geotechnical design and environmental remediation.
View Case Study
Former ATI Tank Farm Redevelopment Site
Environmental engineering and remedial design for a 2.8-acre former Major Oil Storage Facility on the Hudson River, supporting entry into New York State's Brownfield Cleanup Program for mixed-use redevelopment.
View Case StudyTransparent pricing for Health & Safety Plans — get your site-specific estimate
Answer a few questions about your property and get a real price range in under 2 minutes. No sales call required.
- Site-specific range
- Under 2 minutes
- No obligation
- Emailed to you
Preliminary estimate only. Not an engineering quote.
Service inquiry form
Request a Health & Safety Plans Quote
Tell us the site, the scope of field work, and the contaminants involved. We'll return a HASP scope and schedule.
Health & Safety Plans FAQs
Questions from contractors, owners, and program managers mobilizing field crews.
Ready to move on Health & Safety Plans?
Give us the site, the field scope, and the contaminants of concern. We'll return a HASP scope and a delivery date that fits your mobilization.
Related Compliance & Permitting Services
Projects rarely need one service in isolation. These are the scopes most often paired with this one.

NYC E-Designation & OER Program Management
NYC OER E-Designation testing, hazmat, noise, and air quality compliance for development sites.
Learn more
Environmental Compliance Audit
Standard and pre-inspection compliance audits plus annual compliance programs.
Learn more
NJDEP Air Permitting
NJDEP air-quality permitting, Title V, and emission statement preparation.
Learn more
SPCC Plan Preparation & Certification
40 CFR 112 Spill Prevention, Control, and Countermeasure plan preparation and PE certification.
Learn more
Stormwater Management & SWPPP
Stormwater pollution prevention plans, permitting, and post-construction stormwater compliance.
Learn more
Community Air Monitoring (CAMP)
NYSDOH Generic CAMP preparation and real-time perimeter particulate and VOC monitoring during intrusive site work.
Learn moreServices That Work Alongside Health & Safety Plans (HASP)
Scopes our clients most often add to keep one schedule, one regulator conversation, and one point of accountability.

Asbestos & Lead Paint Survey
Certified pre-demolition and pre-renovation asbestos and lead paint surveys for NYC and NJ properties.
Learn more
Community Air Monitoring (CAMP)
NYSDOH Generic CAMP preparation and real-time perimeter particulate and VOC monitoring during intrusive site work.
Learn more
Construction Oversight & Field Engineering
On-site field engineering, QA/QC, and construction administration for NJ and NY projects.
Learn moreHealth & Safety Plans Projects in the NY/NJ Metro
Case studies matched to this scope by the services delivered, the site conditions, and the market the work was performed in.



Industries That Rely on Health & Safety Plans (HASP)
See how teams across these sectors integrate health & safety plans (hasp) into their projects, with regulator-ready deliverables and predictable timelines.

Contractors
From pre-bid geotechnical data to construction-phase environmental monitoring, we help contractors deliver projects on time and within compliance.
Explore industry
Health & Safety
From HAZWOPER-certified field teams to comprehensive health and safety plans, we keep your workers safe and your projects compliant.
Explore industry
Industrial
Whether you're acquiring, developing, or operating industrial facilities, we provide the environmental expertise to protect your investment.
Explore industry
Public Agencies
From on-call task orders to major capital projects, we help municipalities and public agencies deliver infrastructure that serves communities.
Explore industry
Developers
We understand your timeline pressures. Get Phase I ESAs that pass lender scrutiny the first time, with 1-week turnaround when you need it.
Explore industryHealth & Safety Plans (HASP) Across the NY/NJ Metro Area
Licensed teams working locally — pick your market for regional regulators, turnaround times, and recent project work.


