Environmental Impact Statements (EIS)
SEQR, CEQR & NEPA Impact Analysis

Environmental Impact Statement preparation for projects under SEQR, CEQR or NEPA: scoping, the technical impact studies, the Draft and Final EIS documents, and responses to public comment, organized so the lead agency can reach its findings.

  • 100% lender approval on Phase I ESAs
  • 1-week priority Phase I turnaround
  • Fixed-fee, same-day quotes

Free scoping call — fixed-fee quote with the scope locked before we start.

What's Included in an Envicon Environmental Impact Statements Engagement

Scoping & Work Plan

Draft scope of work, public scoping support, and a study schedule that matches the topics the lead agency expects to see analyzed.

Technical Impact Studies

Hazardous materials, natural resources, water quality, stormwater, air, noise and coordination of traffic, socioeconomic and historic resource specialists under one document plan.

Draft & Final EIS Preparation

Existing conditions, impact analysis, alternatives and mitigation written to the agency's format, then the Final EIS with every substantive comment answered.

NEPA Environmental Assessments

Environmental Assessments for federally funded or permitted projects, supporting a Finding of No Significant Impact or the decision to prepare a federal EIS.

When an Environmental Impact Statement Is Required

  • The lead agency issued a Positive Declaration under SEQR or CEQR
  • A large rezoning, campus plan or infrastructure project is a Type I action
  • The project uses federal funding or needs a federal permit, triggering NEPA
  • A Generic EIS is needed for an area-wide plan or phased program
  • An earlier EIS needs a supplement because the project changed
Timeline diagram of EIS documents from scoping to a Findings Statement

The document path

From scoping to a Findings Statement

Scope, Draft EIS, public comment, Final EIS and Findings. The schedule is planned at scoping so the slowest studies start first.

Diagram of a project site linked to traffic, noise, air, water, habitat and community impact topics

Impact topics

Every impact topic in one document plan

Traffic, noise, air, water, habitat and community character are analyzed against the same project description and the same build year.

Diagram of a public hearing where comments on a draft EIS are received

Public review

Comments answered on the record

Each substantive comment from the hearing and the written comment period gets a response in the Final EIS.

Facing a Positive Declaration or a NEPA review?

An EIS is the longest path through environmental review, and the schedule is set by how well the scope and studies are planned. Tell us the project and the agency and we'll outline the work ahead.

Not ready for a full form?

One email with the scope and range. No obligation, no drip sequence.

Transparent pricing for Environmental Impact Statements — get your site-specific estimate

Answer a few questions about your property and get a real price range in under 2 minutes. No sales call required.

  • Site-specific range
  • Under 2 minutes
  • No obligation
  • Emailed to you

Preliminary estimate only. Not an engineering quote.

Service inquiry form

Request a Environmental Impact Statements Quote

Tell us the project, the lead agency and where you are in the review. We'll return an EIS work plan and schedule.

Project location

Type at least three characters to see address suggestions, then use the arrow keys to choose one.

Your information is confidential and routed only to our licensed project team.

Protected by reCAPTCHA — this site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

FAQ

Environmental Impact Statements FAQs

Questions from developers, agencies, institutions and counsel facing a full environmental review.

Ready to move on Environmental Impact Statements?

Send us the project description, the lead agency and any scoping document you have. We'll return an EIS work plan and the studies it needs.

Call Now