Vapor Intrusion Mitigation System Design
SSDS Design, Vapor Barriers & Post-Mitigation Verification

Once sampling confirms a vapor intrusion pathway, the next question is what to build. We design sub-slab depressurization systems and vapor barriers, oversee the install, and run the post-mitigation sampling that proves the building is clear.

  • 100% lender approval on Phase I ESAs
  • 1-week priority Phase I turnaround
  • Fixed-fee, same-day quotes

Free scoping call — fixed-fee quote with the scope locked before we start.

What's Included in an Envicon Vapor Intrusion Mitigation Engagement

Sub-Slab Depressurization System (SSDS) Design

Pilot testing and vacuum influence measurement, suction-point layout, piping and blower sizing, and stamped drawings and specifications ready for bid and permit.

Vapor Barrier & New-Construction Design

Passive and active vapor barrier detailing for new slabs, including penetration sealing, riser stub-ups, and conversion-ready design so a passive system can be activated later.

Installation Oversight & Commissioning

Contractor bid support, construction observation, and commissioning with vacuum field verification, flow and pressure readings, and an as-built record.

Post-Mitigation Verification & O&M

Indoor air and sub-slab confirmation sampling after startup, plus the monitoring, alarm checks, and annual O&M documentation agencies expect for the life of the system.

Choosing the Right Vapor Mitigation System

The right system depends on the foundation, soil, contaminant, occupancy and the regulatory endpoint — not on the equipment a contractor prefers. These are the four approaches we design across NY and NJ.

Active sub-slab depressurization (SSDS)

A fan creates negative pressure beneath the slab, captures vapors before they enter and discharges them above the roofline. Design covers suction-point layout, pressure-field extension, pipe routing, fan range, monitoring ports, condensation and a discharge point clear of windows and HVAC intakes. The workhorse for existing slab-on-grade and basement buildings.

Vapor barriers

Composite, spray-applied or geomembrane liners placed beneath a new slab. A barrier alone is not a complete strategy: seams, penetrations and future slab cuts must stay sealed, and the design must say what happens if verification fails. Usually paired with a venting layer or SSDS.

Passive venting

A sub-slab aggregate layer and vent risers use natural pressure differentials and stack effect, with no fan. Suited to lower-risk new construction, and we design it conversion-ready so a fan can be added if post-installation sampling calls for it.

Building pressurization and HVAC controls

Increased outdoor air, dedicated make-up air or air curtains keep occupied space at positive pressure. Useful as an interim or supplemental control in commercial and industrial buildings with managed HVAC — not a substitute for source control.

NJDEP and NYSDEC/NYSDOH Frameworks

New Jersey and New York evaluate vapor intrusion with different tools, and an NYC property can add a third layer. The framework decides what data you need and what counts as done.

New Jersey — NJDEP VI Technical Guidance

A staged evaluation of receptors and pathways, comparing groundwater, soil gas and indoor air results to the current Vapor Intrusion Screening Levels and Indoor Air Rapid Action Levels. Long-term systems typically carry an institutional control, deed notice or remedial action permit. In Jersey City and Newark, historic fill, former industrial use, USTs and dense utility corridors create multiple preferential pathways.

New York — NYSDOH decision matrices and NYSDEC guidance

NYSDOH soil vapor and indoor air matrices pair sub-slab and indoor results to an action: no further action, monitoring, resampling or mitigation. The matrices now extend beyond the original chlorinated VOCs to petroleum-related compounds; NYSDEC guidance governs the remedial program.

NYC — OER and (E) Designations

A hazardous-materials (E) Designation requires investigation and, where contamination is confirmed, an OER-approved Remedial Action Plan before development, completed to OER's satisfaction before occupancy. Vapor controls then tie directly to permits, construction sequencing, financing and the certificate of occupancy.

Closing or turning a system off

A clean indoor result with the fan running is not closure. Source conditions, stable monitoring history and regulatory concurrence are needed before the control strategy changes — plan the O&M record from day one.

Vapor Mitigation Cost per Square Foot (NY/NJ)

Typical installed ranges per square foot of building footprint. Retrofit work in occupied NYC and NJ buildings, deep slabs and high concentrations push toward the top of each band.

SystemTypical cost / SFConsiderations
Active sub-slab depressurization (SSDS)$5–$15Most effective for existing slabs; ongoing fan energy and O&M.
Vapor barrier$3–$8New construction only; membrane quality and seam detailing drive performance.
Passive venting$2–$5Lower cost; design conversion-ready so a fan can be added if verification fails.
Combined barrier + active system$8–$20Redundant protection for schools, daycare, residential and other sensitive uses.

When Vapor Intrusion Mitigation Is Required

  • Sub-slab or indoor air results exceed NJDEP or NYSDEC-NYSDOH screening levels
  • A remedy or Response Action Outcome requires an engineering control
  • New construction is planned over a site with residual VOCs
  • An NYC (E) Designation or CEQR determination requires vapor controls
  • A lender or tenant requires mitigation before occupancy
  • An existing system is failing, undersized, or has no O&M record

Vapor exceedance on a building you need occupied?

Send the sampling data and the building details and we'll return a mitigation design, an installation cost range, and a schedule to occupancy.

Not ready for a full form?

One email with the scope and range. No obligation, no drip sequence.

Lenders & transaction teams

Closing a deal that needs Vapor Intrusion Mitigation System Design?

Tell us where you sit in the transaction and when it closes. We route your request straight to the team that handles Vapor Intrusion Mitigation System Design and come back with a fixed-fee scope and a schedule built around your closing date.

  • Lender-ready, ASTM-conformant deliverables
  • Scope and fee back within one business day
  • Rush scheduling for closings inside two weeks

Prefer to talk it through? (917) 764-2171

No obligation. We use your email only to send the scope and fee for this request.

Transparent pricing for Vapor Intrusion Mitigation — get your site-specific estimate

Answer a few questions about your property and get a real price range in under 2 minutes. No sales call required.

  • Site-specific range
  • Under 2 minutes
  • No obligation
  • Emailed to you

Preliminary estimate only. Not an engineering quote.

Service inquiry form

Request a Vapor Intrusion Mitigation Quote

Send us the sampling results and the building footprint. We'll come back with a mitigation approach, a design fee, and an installed-cost range.

Project location

Type at least three characters to see address suggestions, then use the arrow keys to choose one.

Your information is confidential and routed only to our licensed project team.

Protected by reCAPTCHA — this site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

FAQ

Vapor Intrusion Mitigation FAQs

Questions from owners and developers scoping a vapor mitigation system.