Former Nuodex Geomembrane Lined Wetlands Pond

Woodbridge, NJ24 monthsIndustrial Remediation Client

Design and construction QA/QC of a 14-acre geomembrane-lined stormwater detention pond to restore wetland and fish habitat within the 185-acre Former Nuodex Corporation Site.

Former Nuodex Geomembrane Lined Wetlands Pond

Project Overview

As part of the comprehensive Nuodex site remediation, Envicon Group designed and provided construction quality assurance for a 14-acre geomembrane-lined stormwater detention pond. This engineered wetland system serves dual purposes: managing stormwater runoff from the remediated site while restoring critical wetland and fish habitat that had been degraded by decades of industrial contamination.

The Challenge

The project required designing a stormwater management system that would meet stringent NJDEP requirements while also functioning as viable wetland habitat. The underlying contaminated soils necessitated a completely lined system to prevent any contact between clean water and subsurface contamination.

Our Solution

Envicon's team developed a multi-layer containment system incorporating a low-permeability clay cap, geomembrane liner system, and mechanical filtration components. The design balanced stormwater management requirements with ecological restoration goals, creating a sustainable wetland environment.

Key Highlights

  • Low-permeability clay cap details and basis of design reports
  • Multi-layer geomembrane cover system management
  • Mechanical filtration systems design
  • Compliance with N.J.A.C. 7:8 Stormwater Management Rules
  • Post-remediation care plans development

Results Achieved

  • Created 14-acre functional wetland habitat
  • Achieved NJDEP stormwater compliance
  • Restored fish habitat in previously contaminated area
  • Established long-term monitoring and maintenance protocols

Project Details

Client

Industrial Remediation Client

Location

Woodbridge, NJ

Duration

24 months

Scope

Design and QA/QC for 14-acre geomembrane-lined stormwater/wetland system

Services Provided

Stormwater Design
Remediation Design
Construction QA/QC
Environmental Engineering
Wetland Design

Share this case study

Transparent pricing for Site Remediation & Brownfield Redevelopment

Answer a few questions about your property and get a real price range in under 2 minutes. No sales call required.

  • Site-specific range
  • Under 2 minutes
  • No obligation
  • Emailed to you

Preliminary estimate only. Not an engineering quote.

FAQ

Former Nuodex Geomembrane Lined Wetlands Pond — Frequently Asked Questions

Common questions about the scope, challenges, and outcomes of this Woodbridge, NJ case study.

Have a Similar environmental? Get a Free Quote

100% lender approval across 350+ Phase I ESAs · 21+ years in the NY/NJ metro market. Same-business-day scoping for NY & NJ owners, lenders, and developers.

Request a Quote for Your Site

Tell us about the property and we'll come back the same business day with scope, schedule, and fee.

Project location

Type at least three characters to see address suggestions, then use the arrow keys to choose one.

Your information is confidential and routed only to our licensed project team.

Protected by reCAPTCHA — this site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Call Now