Skip to main content
Envicon Group
3–5 Day Turnaround
Starting at $2,500
FAA Part 107 Certified

LiDAR, Drone Mapping &

3D Site Modeling

Survey-grade aerial data acquisition, 3D point cloud modeling, and GIS analytics for environmental engineering, civil design, and regulatory compliance across the NY/NJ metro area.

FAA Part 107 Certified Sub-Centimeter Accuracy CAD & GIS Compatible 4.9 Google Rating

Why LiDAR & Drone Technology

Survey-Grade Accuracy

LiDAR delivers sub-centimeter elevation data, 10x more accurate than traditional surveys. Critical for grading design, volumetric calculations, and engineering controls.

90% Faster Data Collection

Drone surveys capture entire sites in hours instead of weeks. Reduce site access time, minimize traffic control costs, and accelerate project timelines.

Regulatory-Ready Deliverables

Georeferenced orthophotos, CAD-compatible 3D models, and GIS map layers formatted for NJDEP, NYSDEC, NYC DOB, and agency submission requirements.

LiDAR & Drone Services

From aerial data collection through GIS analytics, integrated spatial solutions for environmental and civil engineering projects.

Drone Aerial Survey & Mapping

Site documentation, construction progress monitoring, and regulatory submissions requiring high-quality aerial photography and mapping.

Price$2,500–$5,000
Turnaround3–5 Days

FAA Part 107 compliant drone surveys for site documentation, progress monitoring, and orthomosaic mapping. High-resolution aerial imagery stitched into georeferenced orthophotos and digital surface models for engineering and regulatory submissions.

What's Included

  • FAA Part 107 compliant flight operations
  • High-resolution orthomosaic imagery
  • Digital Surface Model (DSM) generation
  • Georeferenced deliverables (GeoTIFF, KMZ)
  • Site progress comparison photos
  • Regulatory-quality documentation

LiDAR 3D Site Modeling

Civil engineering design, grading plans, remediation volume estimates, and environmental site characterization requiring survey-grade accuracy.

Price$5,000–$12,000
Turnaround1–2 Weeks

Airborne or terrestrial LiDAR scanning to produce high-density 3D point clouds, digital elevation models (DEMs), and topographic surveys. Sub-centimeter accuracy for grading design, volumetric calculations, and environmental site characterization.

What's Included

  • LiDAR point cloud acquisition & processing
  • Digital Elevation Model (DEM) generation
  • Topographic contour mapping
  • Volumetric cut/fill calculations
  • 3D site model in CAD-compatible format
  • Ground truth survey verification

GIS Integration & Analytics

Environmental programs, brownfield redevelopment, and infrastructure projects requiring geospatial analysis and stakeholder communication tools.

Price$3,000–$8,000
Turnaround1–2 Weeks

Integration of drone and LiDAR data into GIS platforms for environmental analysis, asset management, and regulatory reporting. Includes custom map layers, spatial analysis, historical comparison, and interactive web maps for stakeholder communication.

What's Included

  • GIS database creation & data integration
  • Custom environmental map layers
  • Historical aerial imagery comparison
  • Spatial analysis & site scoring
  • Interactive web map for stakeholder access
  • Regulatory submission-ready map exports

FAA-Certified Operations

All drone operations are conducted by FAA Part 107 certified pilots with COA (Certificate of Authorization) for urban airspace. LiDAR data is processed by licensed surveyors and engineers to ensure regulatory compliance.

Free Download

Aerial Survey Scoping Checklist

LiDAR, Drone & GIS Deliverable Planning

Scoping reference for LiDAR, drone-based photogrammetry, and orthomosaic deliverables, accuracy classes, FAA Part 107 considerations, and data-format planning.

Accuracy class & deliverable-format planner
FAA Part 107 & airspace pre-flight checklist
Ground-control point planning guide
Output integration with GIS / CAD workflows
PDF Guide • Sent to your email

Get Instant Access

By submitting, you agree to receive relevant industry updates.

This document is for informational purposes only and does not constitute professional engineering advice. For project-specific guidance, contact a licensed professional engineer.

Transparent pricing for LiDAR & Drone Mapping — get your site-specific estimate

Answer a few questions about your property and get a real price range in under 2 minutes. No sales call required.

  • Site-specific range
  • Under 2 minutes
  • No obligation
  • Emailed to you

Preliminary estimate only. Not an engineering quote.

Service inquiry form

Request a Free Project Consultation

Tell us about your property and we'll respond with a tailored scope and pricing within 2 business hours.

Project location

Type at least three characters to see address suggestions, then use the arrow keys to choose one.

Your information is confidential and routed only to our licensed project team.

Protected by reCAPTCHA — this site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Frequently Asked Questions

LiDAR & Drone Mapping Questions

Get answers to common questions about our lidar & drone mapping services, turnaround times, and deliverables.

Tell us about your site

A licensed engineer will get back to you the same business day.

5.0(1 Google review)
Project Location

Type at least three characters to see address suggestions, then use the arrow keys to choose one.

Call Now