Project Portfolio
Discover how we've helped developers, lenders, and property owners navigate complex environmental challenges across the NY/NJ metropolitan area.
Source: 100% lender approval across 350+ Phase I ESAs. Measured as the share of 350+ delivered ASTM E1527-21 Phase I ESAs accepted by the client's lender without rejection, 2005–present. Timeframe: 2005–present.

Riverside Park South – Phase 6
Final phase of a major waterfront park development on Manhattan's Upper West Side, transforming a former rail yard into public recreational facilities including a multi-use sports field, basketball courts, pedestrian pathways, and landscaped open space.

12-Story Brownfield Redevelopment
Remedial engineering and construction support for a Brownfield Cleanup Program site impacted by chlorinated volatile organic compounds (CVOCs) from former dry-cleaning operations, enabling 12-story mixed-use development.

Woodbridge Energy Center Brownfields Redevelopment
Brownfield site redevelopment of a former chemical manufacturing facility along the Raritan River, supporting construction of a new gas-fired power plant through comprehensive geotechnical design and environmental remediation.

Southwest Brooklyn Marine Transfer Station
Design-during-construction and resident engineer support services for a $150 million pile-supported marine transfer station with 700-900 ton daily capacity, providing project management, multi-agency permit coordination, and design change management.

11th Street Boutique Hotel Construction
Remedial design and construction oversight for an 11-story boutique hotel on a site impacted by petroleum and heavy-metal-contaminated soils, including UST removal and soil management.

1985 Jerome Ave Phase II Investigation
Expedited shallow soil investigation to support removal of NYC OER E-Designation and inform remedial planning for a proposed residential/mixed-use redevelopment.

Former Nuodex Geomembrane Lined Wetlands Pond
Design and construction QA/QC of a 14-acre geomembrane-lined stormwater detention pond to restore wetland and fish habitat within the 185-acre Former Nuodex Corporation Site.

59th Street Marine Transfer Station
Extensive façade pressure washing and decontamination with barge-based wastewater management for cadmium and lead-impacted runoff, supporting a $50 million facility rehabilitation program.

Brooklyn Warehouse Conversion
Environmental due diligence for adaptive reuse of historic warehouse into creative office space.

Former Gas Station Remediation
UST removal and soil remediation at a former service station for retail redevelopment.

Manhattan Commercial Portfolio Assessment
Comprehensive Phase I ESA portfolio review for 12 commercial properties in Manhattan with tight acquisition timeline.

Newark Prudential Office Complex Construction
Site remediation and LSRP services for fast-track construction of a 26-story office building and parking garage on a 2.7-acre downtown Newark city block.

PATH Tunnel A, B, C & D Redevelopment
$750M multi-tunnel security and resiliency redevelopment program providing comprehensive program and contract management across four active tunnels.

BICC Cables Site DCU Area 2B Sediment Remediation
Innovative sediment remediation for a 17-acre Hudson River waterfront site under the NYSDEC Brownfield Cleanup Program, resolving PCB contamination after six previous unsuccessful remediation attempts.

PATH Tunnel Event Detection System
Management of PATH's upgraded security event detection and monitoring system through design, commissioning, and long-term operations planning.

Harrison MGP Site – PATH Substation IRM
Remedial action oversight for site preparation of a future PATH electric substation, including below-grade excavation, dewatering treatment, and installation of geosynthetic liner and clean cap.

PATH Floodgates & Resilient Tunnel Plug
Development of flood mitigation systems including floodgates and tunnel plugs to enhance tunnel resilience and life-safety performance.

Hoboken PATH Station Rehabilitation
Construction management for $100 million station reconstruction including structural rehabilitation, ADA upgrades, floodproofing systems, and façade restoration while maintaining nightly operations.

Former ATI Tank Farm Redevelopment Site
Environmental engineering and remedial design for a 2.8-acre former Major Oil Storage Facility on the Hudson River, supporting entry into New York State's Brownfield Cleanup Program for mixed-use redevelopment.

Pulaski Skyway Rehabilitation
Design and construction support for NJDOT's $500 million rehabilitation of the historic Pulaski Skyway, including rocker-bent repairs and seismic retrofits.

NJ Turnpike Interchange 1-4 Capacity Enhancements
Senior Bridge Design & Structural lead for Sections 6 and 7 of a $4.3B NJTA capital expansion program, involving 17 bridge replacements and major roadway structures.

I-80 over Route 17 Bridge Replacement
Structural design of a skewed multi-span bridge replacement to maintain continuous operations on a critical NJ corridor for NJDOT.

I-80 over Lehigh River Dual Bridge Replacement
Design of two replacement bridges supported on micropile-supported, tulip-shaped piers for PennDOT, including foundation design and constructability logistics.

I-295 Missing Moves Interchange Program
Structural and geotechnical engineering design for new connections linking I-295 and Route 130 via prestressed concrete spans and hammerhead piers.

Van Wyck Expressway – JFK Modernization
Structural design support for an accelerated ~$200M bridge replacement program tied to John F. Kennedy International Airport's modernization program.

Route 82 Bridge Replacements
Construction management for prefabricated steel and concrete bridge replacements (~$25M) on H-pile foundations for the Connecticut Department of Transportation.

Hoboken Stormwater Management
Design and implementation of green infrastructure for flood mitigation in urban development.

NHSA Treatment Plant Upgrade Projects
Construction phase management for wastewater facility improvements including siphon sewer relining, PURAC filtration upgrades, and major switchgear replacement while maintaining continuous plant operations.

Newark Liberty Airport Terminal & Bridge Expansion
Geotechnical investigations and foundation design support for major terminal and bridge expansion at Newark Liberty International Airport.

Farrington Street Flush Truck Facility Construction
Qualified Environmental Professional (QEP) services for utility infrastructure construction, including NYSDEC Site Management Plan compliance, Community Air Monitoring, and soil characterization on a 2-acre site.

Jersey City Mixed-Use Brownfield Redevelopment
Complete environmental assessment and remediation of a former industrial site converted to luxury residential development.
Project lifecycle
How the projects in this portfolio were delivered
Each case study below moved through the same lifecycle — scoping, field investigation, data, deliverable, and regulatory closure.

Step 1: Site reconnaissance
Days 2-5
Field staff walk the site, log conditions, and interview operators so the scope reflects what is actually there.

Step 2: Sampling & analysis
Week 2
Soil, groundwater, vapor, or air data is collected and run through accredited laboratories with documented chain of custody.

Step 3: Sealed deliverable
72-hr priority option
You receive a signed, ASTM- or agency-compliant report with findings, costs, and clear next steps.

Step 4: Filing & closure
We submit to the reviewing agency, answer comments, and carry the file through approval or no-further-action.

Our portfolio
Every project type, from screening to closure
Due diligence, remediation, geotechnical, and civil site work across industrial, commercial, and municipal properties — each engagement documented end to end.

How we finish
Remediation carried through to regulatory closure
We design the cleanup, manage the field work, and drive the file to a No Further Action or closure letter so your transaction or build can move forward.
Frequently Asked Questions
Common questions about our project portfolio.
Have a Similar Project?
Let's discuss how Envicon Group can help you achieve your environmental and development goals.
Start Your Project