Newark Liberty Airport Terminal & Bridge Expansion
Geotechnical investigations and foundation design support for major terminal and bridge expansion at Newark Liberty International Airport.
Project Overview
Performed geotechnical investigations and foundation design support for major terminal and bridge expansion at Newark Liberty International Airport. The project required conducting subsurface investigations and seismic classification within an active, high-security environment.
The Challenge
Conducting subsurface investigations and seismic site classification within an active, high-security airport environment.
Our Solution
Performed borings, field testing, and seismic site classification. Analyzed subsurface data and produced a comprehensive geotechnical basis-of-design report with recommended foundation approaches, alternatives analyses, and engineering recommendations.
Key Highlights
- Conducted geotechnical investigations in high-security environment
- Performed seismic site classification
- Analyzed subsurface conditions and data
- Produced comprehensive basis-of-design report
- Recommended foundation approaches and alternatives
Results Achieved
- Delivered comprehensive geotechnical analysis
- Supported major terminal expansion design
- Successfully navigated high-security constraints
- Provided actionable foundation recommendations
Project Details
Client
Port Authority of NY & NJ
Location
Newark, NJ
Duration
12 months
Scope
Geotechnical support for airport terminal and bridge expansion
Services Provided
Share this case study
Related Services


You May Also Need
Structural & Transportation
Matches “structural” scope
Structural and transportation engineering for bridge, highway, and transit assets.
BIM & Civil 3D
Matches “design” scope
Civil 3D corridor and grading models, BIM coordination, and clash detection that tie survey, subsurface, and design data into one buildable model.
GPR Survey
Matches “structural” scope
Non-destructive subsurface utility, tank, and structural GPR investigations.
Bridge Engineering
Matches “design” scope
NBIS inspection, load rating, rehabilitation and replacement design, and construction-phase engineering for NY/NJ structures.
Where We Work Nearby
Industries We Serve
Services Available in This Market
Newark Liberty Airport Terminal & Bridge Expansion — Frequently Asked Questions
Common questions about the scope, challenges, and outcomes of this Newark, NJ case study.
Similar Projects
Have a Similar structural? Get a Free Quote
100% lender approval across 350+ Phase I ESAs · 21+ years in the NY/NJ metro market. Same-business-day scoping for NY & NJ owners, lenders, and developers.
Request a Quote for Your Site
Tell us about the property and we'll come back the same business day with scope, schedule, and fee.