
Water & Wastewater Engineering
Conveyance, Pump Stations, Treatment & Permitting
Design and permitting for water and wastewater infrastructure — conveyance, pump stations, treatment upgrades, and industrial pretreatment — with the NJPDES and SPDES permitting work handled by the same team that stamps the drawings.
- 100% lender approval on Phase I ESAs
- 1-week priority Phase I turnaround
- Fixed-fee, same-day quotes
Free scoping call — fixed-fee quote with the scope locked before we start.
How the engineering runs
Investigation, analysis, sealed drawings, construction support.
- 01
Scope & kickoff
Same-business-day scope, fee range and delivery date.
Request a scope - 02
Field investigation
Borings, survey and existing-condition capture.
See what's included - 03
Analysis & sealed design
P.E.-sealed drawings and calculations for permit submission.
When it applies - 04
Construction support
RFIs, submittals and field verification through closeout.
Read the FAQs - 05
Common next step
The work most clients authorize once this closes out.
Stormwater & SWPPP - 06
Start the engagement
Send the site details — we scope it and price it.
Start the engagement
What's Included in an Envicon Water & Wastewater Engagement
Conveyance & Collection System Design
Gravity sewer, force main, and water main design with hydraulic modeling, condition assessment, and infiltration/inflow evaluation.
Pump Station Design & Rehabilitation
Wet-well and submersible station design, hydraulics and pump selection, controls and SCADA integration, and rehabilitation of aging stations.
Treatment & Pretreatment Systems
Process evaluation, treatment plant upgrades, and industrial pretreatment system design to meet discharge limits and local sewer-use ordinances.
Discharge Permitting & Compliance
NJPDES and SPDES permit applications and renewals, treatment works approvals, sampling programs, and discharge monitoring report support.
When Owners Engage Us
- A pump station or treatment unit is past useful life
- A discharge permit renewal brings tighter effluent limits
- Industrial process water requires pretreatment before discharge
- A development requires sanitary sewer extension and TWA approval
- Infiltration and inflow are driving treatment costs
- Capital planning requires condition assessment and cost projection
Treatment upgrade tied to a permit or grant deadline?
Tell us the flow, the permit driver, and the funding source and we'll return an engineering scope, a fee range, and a submission schedule.
Pairs Naturally With

Stormwater & SWPPP
Stormwater permitting and design coordinated with sanitary infrastructure work.
Explore service
Geotechnical Investigation
Subsurface data for deep wet wells, trenchless crossings, and structure foundations.
Explore service
Dewatering Design
Construction dewatering design and permitting for deep utility and structure excavations.
Explore serviceWater & Wastewater Past Performance
Representative projects from our NY/NJ portfolio.

NJ Turnpike Interchange 1-4 Capacity Enhancements
Senior Bridge Design & Structural lead for Sections 6 and 7 of a $4.3B NJTA capital expansion program, involving 17 bridge replacements and major roadway structures.
View Case Study
Pulaski Skyway Rehabilitation
Design and construction support for NJDOT's $500 million rehabilitation of the historic Pulaski Skyway, including rocker-bent repairs and seismic retrofits.
View Case Study
Newark Liberty Airport Terminal & Bridge Expansion
Geotechnical investigations and foundation design support for major terminal and bridge expansion at Newark Liberty International Airport.
View Case StudyTransparent pricing for Water & Wastewater — get your site-specific estimate
Answer a few questions about your property and get a real price range in under 2 minutes. No sales call required.
- Site-specific range
- Under 2 minutes
- No obligation
- Emailed to you
Preliminary estimate only. Not an engineering quote.
Service inquiry form
Request a Water & Wastewater Quote
Describe the system, the driver — capacity, condition, or permit limit — and the funding timeline. We'll scope the study or design.
Water & Wastewater FAQs
Questions from municipal engineers, authorities, and industrial facility managers.
Ready to move on Water & Wastewater?
Send the permit or grant deadline and we'll build the engineering schedule backwards from it.
Related Civil & Geotechnical Services
Projects rarely need one service in isolation. These are the scopes most often paired with this one.

Dewatering Design & Permitting
Construction dewatering system design, permitting, and field oversight for NJ and NY sites.
Learn more
Geotechnical Investigation
Soil borings, geotechnical sampling, and foundation recommendations for NJ, NY, and PA.
Learn more
Construction Oversight & Field Engineering
On-site field engineering, QA/QC, and construction administration for NJ and NY projects.
Learn more
NJ Structural Integrity Law Inspections (S.2760)
NJ S.2760 Structural Integrity Law inspections for condominium and co-op associations.
Learn more
Structural & Transportation Engineering
Structural and transportation engineering for bridge, highway, and transit assets.
Learn more
Reserve Studies
Reserve studies for NY and NJ condominiums, co-ops, and HOAs.
Learn moreServices That Work Alongside Water & Wastewater Engineering
Scopes our clients most often add to keep one schedule, one regulator conversation, and one point of accountability.

Stormwater Management & SWPPP
Stormwater pollution prevention plans, permitting, and post-construction stormwater compliance.
Learn more
NJDEP Air Permitting
NJDEP air-quality permitting, Title V, and emission statement preparation.
Learn more
Environmental Grant & Funding Support
Grant identification, application preparation, and reimbursement documentation for brownfield, remediation, and resiliency funding programs.
Learn moreWater & Wastewater Projects in the NY/NJ Metro
Case studies matched to this scope by the services delivered, the site conditions, and the market the work was performed in.
View all case studiesIndustries That Rely on Water & Wastewater Engineering
See how teams across these sectors integrate water & wastewater engineering into their projects, with regulator-ready deliverables and predictable timelines.

Developers
We understand your timeline pressures. Get Phase I ESAs that pass lender scrutiny the first time, with 1-week turnaround when you need it.
Explore industry
Contractors
From pre-bid geotechnical data to construction-phase environmental monitoring, we help contractors deliver projects on time and within compliance.
Explore industry
Public Agencies
From on-call task orders to major capital projects, we help municipalities and public agencies deliver infrastructure that serves communities.
Explore industry
Institutional
Hospitals, universities, and nonprofits face unique environmental challenges. We help you protect your community while managing complex property portfolios.
Explore industry
Architects
We provide the environmental and geotechnical intelligence architects need to design with confidence, from site analysis through construction.
Explore industryWater & Wastewater Engineering Across the NY/NJ Metro Area
Licensed teams working locally — pick your market for regional regulators, turnaround times, and recent project work.



