Environmental Engineering Glossary

Terms & Definitions

Comprehensive reference for environmental engineering, site remediation, and regulatory compliance terminology used in the NY/NJ market.

All (38)
Assessment (7)
Brownfield (3)
Compliance (2)
Contamination (6)
Geotechnical (3)
NJ Regulatory (6)
NYC Regulatory (3)
Remediation (4)
Standards (1)
Tank Management (2)
Technology (1)

A

AST (Aboveground Storage Tank)

Tank Management

A storage tank located on the ground surface. Subject to SPCC (Spill Prevention, Control, and Countermeasure) regulations if storing oil.

ASTM E1527-21

Standards

The current ASTM International standard practice for Environmental Site Assessments (Phase I). This standard defines the scope and methodology for identifying recognized environmental conditions during commercial real estate transactions.

ASTM E1527-21 Guide

B

BCP (Brownfield Cleanup Program)

Brownfield

Voluntary cleanup programs administered by state agencies (NYSDEC in New York, NJDEP in New Jersey) that provide liability protection, tax credits, and regulatory oversight for brownfield remediation.

Bearing Capacity

Geotechnical

The ability of soil or rock to support structural loads without excessive settlement or shear failure. Determined through geotechnical investigation and analysis.

Brownfield

Brownfield

Real property where expansion, redevelopment, or reuse may be complicated by the presence or potential presence of hazardous substances, pollutants, contaminants, or petroleum products.

Brownfield Redevelopment Services

Brownfield Tax Credit

Brownfield

State and federal tax incentives available for qualified environmental remediation expenses at brownfield sites. New Jersey and New York both offer significant credits for eligible projects.

Brownfield Tax Credits Guide

C

CAMP

Remediation

Community Air Monitoring Plan. A real-time air monitoring program required during remediation activities to protect nearby residents and workers from exposure to airborne contaminants.

CEA (Classification Exception Area)

NJ Regulatory

An institutional control in New Jersey designating an area of groundwater that does not meet applicable standards. Restricts groundwater use and requires long-term monitoring.

CREC (Controlled Recognized Environmental Condition)

Assessment

A recognized environmental condition resulting from a past release that has been addressed but with residual contamination remaining in place, subject to controls such as activity and use limitations.

D

Deed Notice

Remediation

An institutional control recorded on a property deed that provides notice of residual contamination and any restrictions on property use. Required when contamination remains above unrestricted use standards.

E

E-Designation

NYC Regulatory

A zoning map designation in New York City that identifies sites where environmental requirements must be met before development. Properties with E-Designations require environmental investigations and potential remediation before construction permits are issued.

E-Designation Services

EDR (Environmental Data Resources)

Assessment

A vendor providing environmental database reports used in Phase I ESAs. Compiles federal, state, and local environmental records for property locations.

G

Geotechnical Investigation

Geotechnical

Subsurface investigation to characterize soil and rock conditions for foundation design, slope stability, and construction planning. Includes test borings, sampling, and laboratory testing.

Civil & Geotechnical Services

GIS (Geographic Information System)

Technology

Technology for capturing, storing, analyzing, and displaying spatial data. Used in environmental consulting for site mapping, contamination visualization, and regulatory research.

Digital & GIS Services

H

HREC (Historical Recognized Environmental Condition)

Assessment

A past release of hazardous substances or petroleum products that has been addressed to the satisfaction of the applicable regulatory authority or meets unrestricted use criteria.

I

ISRA

NJ Regulatory

Industrial Site Recovery Act. New Jersey law requiring environmental investigation and cleanup of industrial establishments upon closure, transfer, or cessation of operations.

L

LSRP

NJ Regulatory

Licensed Site Remediation Professional. A New Jersey-licensed environmental professional authorized to oversee and approve site investigation and remediation activities under the Site Remediation Reform Act (SRRA).

LSRP Remediation Guide

M

Monitoring Well

Assessment

A well installed to collect groundwater samples and measure water levels. Used to characterize contamination extent, monitor plume migration, and verify remediation effectiveness.

MS4 Permit

Compliance

Municipal Separate Storm Sewer System permit required under the Clean Water Act. Regulates stormwater discharges from municipal storm drain systems to protect water quality.

N

NJDEP

NJ Regulatory

New Jersey Department of Environmental Protection. The state agency responsible for environmental regulation, permitting, and enforcement in New Jersey.

NYC VCP

NYC Regulatory

New York City Voluntary Cleanup Program administered by OER. Provides liability protection and tax incentives for properties enrolled and remediated under the program.

O

OER (Office of Environmental Remediation)

NYC Regulatory

New York City's Office of Environmental Remediation within the Mayor's Office. Oversees the NYC Voluntary Cleanup Program (VCP) and E-Designation program for brownfield properties requiring environmental cleanup.

P

PAH (Polycyclic Aromatic Hydrocarbon)

Contamination

A class of chemicals formed during incomplete combustion of organic materials. Common in urban fill, former manufactured gas plant sites, and petroleum-impacted properties.

PCB (Polychlorinated Biphenyl)

Contamination

Synthetic chemicals formerly used in electrical equipment, hydraulic fluids, and building materials. Regulated as hazardous substances due to persistence and toxicity.

PFAS

Contamination

Per- and polyfluoroalkyl substances. A group of manufactured chemicals used in various industrial and consumer products. Known as 'forever chemicals' due to their environmental persistence. Subject to increasingly stringent regulation.

PFAS Guidance

Phase I ESA

Assessment

Phase I Environmental Site Assessment per ASTM E1527-21. A records review, site reconnaissance, and interview-based investigation to identify recognized environmental conditions (RECs) on a property prior to acquisition or refinancing.

Environmental Assessment Services

Phase II ESA

Assessment

Phase II Environmental Site Assessment involving subsurface investigation including soil, groundwater, and soil vapor sampling to evaluate recognized environmental conditions identified in a Phase I ESA.

Environmental Assessment Services

R

RAO

NJ Regulatory

Response Action Outcome. The formal document issued by an LSRP in New Jersey certifying that a site has been remediated to applicable standards and no further action is required.

RAWP

Remediation

Remedial Action Work Plan. A detailed document outlining the proposed remediation approach, technologies, schedule, and performance standards for cleaning up a contaminated site.

Remediation Services

REC (Recognized Environmental Condition)

Assessment

The presence or likely presence of hazardous substances or petroleum products in, on, or at a property due to release to the environment, under conditions indicative of a release, or under conditions that pose a material threat of a future release.

S

SPT (Standard Penetration Test)

Geotechnical

A field test during soil boring that measures soil resistance. The blow count (N-value) indicates soil density and strength for foundation design.

SRP

NJ Regulatory

Site Remediation Program. NJDEP's program overseeing the investigation and cleanup of contaminated sites in New Jersey under LSRP oversight.

Sub-Slab Depressurization System (SSDS)

Remediation

An active vapor mitigation system that creates negative pressure beneath a building's foundation to prevent vapor intrusion. Uses fans and piping to exhaust subsurface vapors to the atmosphere.

SVOC (Semi-Volatile Organic Compound)

Contamination

Organic compounds that evaporate more slowly than VOCs. Include PAHs (polycyclic aromatic hydrocarbons) from petroleum and combustion sources.

SWPPP

Compliance

Stormwater Pollution Prevention Plan. A site-specific document required under the Clean Water Act that describes the measures a construction site or industrial facility will implement to prevent stormwater pollution.

Compliance & Permitting Services

U

UST (Underground Storage Tank)

Tank Management

A tank with at least 10% of its volume underground, typically used for petroleum storage. Subject to federal and state regulations for installation, operation, and closure.

V

Vapor Intrusion

Contamination

The migration of volatile organic compounds (VOCs) from contaminated soil or groundwater into overlying buildings through cracks, utility conduits, or permeable materials. A significant pathway for human exposure requiring assessment and mitigation.

Vapor Intrusion Guide

VOC (Volatile Organic Compound)

Contamination

Organic chemicals that evaporate easily at room temperature. Common groundwater and soil contaminants from industrial solvents, petroleum products, and dry cleaning operations.