
Community Air Monitoring (CAMP)
NYSDOH Generic CAMP · Real-Time Perimeter Monitoring
Community Air Monitoring Plans written to NYSDOH Generic CAMP requirements and executed in the field with real-time particulate and VOC monitoring, action-level response, and daily reporting your agency reviewer expects.
- 100% lender approval on Phase I ESAs
- 1-week priority Phase I turnaround
- Fixed-fee, same-day quotes
Free scoping call — fixed-fee quote with the scope locked before we start.
How a permit runs
Applicability, application, agency review, permit in hand.
- 01
Scope & kickoff
Same-business-day scope, fee range and delivery date.
Request a scope - 02
Applicability review
What you actually need — and what you can skip.
See what's included - 03
Application package
Calculations, drawings and forms assembled to agency format.
When it applies - 04
Agency review
We answer the deficiency letters, not you.
Read the FAQs - 05
Common next step
The work most clients authorize once this closes out.
NYC (E) Designation - 06
Start the engagement
Send the site details — we scope it and price it.
Start the engagement
What's Included in an Envicon Community Air Monitoring Engagement
CAMP Preparation & Agency Approval
Site-specific plans built on the NYSDOH Generic CAMP, including monitoring locations, action levels, response actions, and integration with the Health and Safety Plan.
Real-Time Particulate & VOC Monitoring
Upwind and downwind PM10 and photoionization detector stations with continuous logging, telemetry, and immediate alerting when action levels are approached.
Action-Level Response & Dust Control
Documented work-stoppage and dust-suppression procedures, plus on-call field staff who make the call and record it rather than reconstructing it later.
Daily Logs & Agency Reporting
Daily monitoring summaries, exceedance documentation, and the compiled record required for NYSDEC/NYSDOH closeout of BCP and E-Designation sites.
When Community Air Monitoring Is Required
- Excavation or soil disturbance at a NYSDEC BCP or VCP site
- NYC (E) Designation or Restrictive Declaration remediation
- Demolition or abatement adjacent to occupied buildings
- Remedial excavation in a dense residential neighborhood
- Track-out and dust complaints on an active site
- A Remedial Action Work Plan that references the Generic CAMP
Excavation starting and no CAMP in place?
Send us the site, the work scope, and the start date. We'll return a NYSDOH-compliant Community Air Monitoring Plan scope, a monitoring day-rate, and a mobilization date — usually the same business day.
Pairs Naturally With

NYC (E) Designation
CAMP execution is a standing requirement of (E) Designation remedial work in New York City.
Explore service
NYSDEC BCP
Air monitoring during BCP remedial excavation and closeout documentation.
Explore service
Asbestos & Lead Survey
Survey and abatement monitoring paired with perimeter air monitoring for demolition.
Explore serviceCommunity Air Monitoring Past Performance
Representative projects from our NY/NJ portfolio.

Southwest Brooklyn Marine Transfer Station
Design-during-construction and resident engineer support services for a $150 million pile-supported marine transfer station with 700-900 ton daily capacity, providing project management, multi-agency permit coordination, and design change management.
View Case Study
59th Street Marine Transfer Station
Extensive façade pressure washing and decontamination with barge-based wastewater management for cadmium and lead-impacted runoff, supporting a $50 million facility rehabilitation program.
View Case Study
Hoboken Stormwater Management
Design and implementation of green infrastructure for flood mitigation in urban development.
View Case StudyTransparent pricing for Community Air Monitoring — get your site-specific estimate
Answer a few questions about your property and get a real price range in under 2 minutes. No sales call required.
- Site-specific range
- Under 2 minutes
- No obligation
- Emailed to you
Preliminary estimate only. Not an engineering quote.
Service inquiry form
Request a Community Air Monitoring Quote
Tell us the site, the work scope, and the start date. We'll price the plan and the field monitoring separately so you see both.
Community Air Monitoring FAQs
Questions from contractors, developers, and site managers planning monitored excavation work.
Ready to move on Community Air Monitoring?
Tell us when ground breaks and we'll have the plan approved and monitors on the fence line before your first load leaves the site.
Related Compliance & Permitting Services
Projects rarely need one service in isolation. These are the scopes most often paired with this one.

NYC E-Designation & OER Program Management
NYC OER E-Designation testing, hazmat, noise, and air quality compliance for development sites.
Learn more
Environmental Compliance Audit
Standard and pre-inspection compliance audits plus annual compliance programs.
Learn more
NJDEP Air Permitting
NJDEP air-quality permitting, Title V, and emission statement preparation.
Learn more
SPCC Plan Preparation & Certification
40 CFR 112 Spill Prevention, Control, and Countermeasure plan preparation and PE certification.
Learn more
Stormwater Management & SWPPP
Stormwater pollution prevention plans, permitting, and post-construction stormwater compliance.
Learn more
NJ ISRA Compliance
Industrial Site Recovery Act applicability, notice filings, transaction instruments, and LSRP-led closure for NJ industrial transfers.
Learn moreServices That Work Alongside Community Air Monitoring (CAMP)
Scopes our clients most often add to keep one schedule, one regulator conversation, and one point of accountability.

Asbestos & Lead Paint Survey
Certified pre-demolition and pre-renovation asbestos and lead paint surveys for NYC and NJ properties.
Learn more
Health & Safety Plans (HASP)
Site-specific HASPs, HAZWOPER compliance documentation, and field safety oversight for investigation, remediation, and construction work.
Learn more
Site Management Plans
Post-remedy Site Management Plans, engineering and institutional control monitoring, and Periodic Review Reports.
Learn moreCommunity Air Monitoring Projects in the NY/NJ Metro
Case studies matched to this scope by the services delivered, the site conditions, and the market the work was performed in.



Industries That Rely on Community Air Monitoring (CAMP)
See how teams across these sectors integrate community air monitoring (camp) into their projects, with regulator-ready deliverables and predictable timelines.

Contractors
From pre-bid geotechnical data to construction-phase environmental monitoring, we help contractors deliver projects on time and within compliance.
Explore industry
Public Agencies
From on-call task orders to major capital projects, we help municipalities and public agencies deliver infrastructure that serves communities.
Explore industry
Developers
We understand your timeline pressures. Get Phase I ESAs that pass lender scrutiny the first time, with 1-week turnaround when you need it.
Explore industry
Health & Safety
From HAZWOPER-certified field teams to comprehensive health and safety plans, we keep your workers safe and your projects compliant.
Explore industry
Institutional
Hospitals, universities, and nonprofits face unique environmental challenges. We help you protect your community while managing complex property portfolios.
Explore industryCommunity Air Monitoring (CAMP) Across the NY/NJ Metro Area
Licensed teams working locally — pick your market for regional regulators, turnaround times, and recent project work.


