Skip to main content
Envicon Group
RSRA in 3–5 Business Days
SBA SOP 50 10 / ASTM E1527-21
Accepted by 7(a) & 504 Lenders

SBA Environmental Due Diligence
SOP 50 10 Scoped · Lender Reliance Included

Environmental due diligence scoped to the SBA SOP 50 10 decision tree — the right report at the right level, with the reliance language and Environmental Professional qualifications your loan file needs.

  • 100% lender approval on Phase I ESAs
  • 1-week priority Phase I turnaround
  • Fixed-fee, same-day quotes

Free scoping call — fixed-fee quote with the scope locked before we start.

What's Included in an Envicon SBA Due Diligence Engagement

NAICS Screen & Decision-Tree Placement

We check the property's current and historical NAICS codes against the SBA environmentally sensitive industry list and tell you which report level the SOP actually requires — before you order the wrong one.

RSRA, Transaction Screen or Phase I ESA

Records Search with Risk Assessment for lower-risk collateral, Transaction Screen where the SOP allows it, and a full ASTM E1527-21 Phase I where the decision tree or your credit policy requires it.

Reliance Letters & EP Qualifications

Reliance extended to the lender, SBA, and any CDC or secondary-market participant, with the Environmental Professional statement and qualifications the loan file must carry.

Escrow, Indemnity & Condition Support

Where contamination is identified, we quantify the exposure and support the remediation escrow, indemnity, or environmental insurance condition so the loan can still close.

When SBA Environmental Due Diligence Is Required

  • 7(a) or 504 loan secured by commercial real estate
  • Collateral falls within an SBA environmentally sensitive NAICS code
  • Gas station, dry cleaner, auto repair, or former industrial use
  • A prior report is over 180 days old at closing
  • CDC or secondary-market participant requires named reliance
  • Credit committee requires escalation from RSRA to Phase I

Need SBA Due Diligence on a deadline?

Tell us the site and the driver and we'll come back with a SBA Environmental Due Diligence scope, a price range, and a delivery date — usually the same business day.

Not ready for a full form?

One email with the scope and range. No obligation, no drip sequence.

Lenders & transaction teams

Closing a deal that needs SBA Environmental Due Diligence?

Tell us where you sit in the transaction and when it closes. We route your request straight to the team that handles SBA Environmental Due Diligence and come back with a fixed-fee scope and a schedule built around your closing date.

  • Lender-ready, ASTM-conformant deliverables
  • Scope and fee back within one business day
  • Rush scheduling for closings inside two weeks

Prefer to talk it through? (917) 764-2171

No obligation. We use your email only to send the scope and fee for this request.

Environmental Due Diligence

Choose Your Level of Protection

Service comparison — not a formal proposal

Four levels of due-diligence coverage for NY and NJ property transactions — from a fast desktop read to a pre-closing subsurface investigation. Each level buys you a different amount of liability protection.

Protection: Entry

Desktop Review

Protection strength 1 of 4 — Entry.

A fast go/no-go read before you commit. No field visit, and it does not meet the ASTM standard.

from $850

flat fee

Draft in 3-5 business days

Protection: Standard

Phase I ESA

Protection strength 2 of 4 — Standard.

The standard. Meets ASTM E1527-21 with a site visit and a report signed by an Environmental Professional.

from $2,200

lump sum

Draft in 2-3 weeks

See what Phase I ESA covers
Recommended

Protection: Full

Phase I + Transfer Screen + Lien Search

Protection strength 3 of 4 — Full.

Full Phase I, the state transfer-trigger answer you need before closing, and a hidden-lien check.

from $3,850

lump sum

Draft in 2-3 weeks

See what Phase I + Transfer Screen + Lien Search covers

Protection: Maximum

All-In

Protection strength 4 of 4 — Maximum.

Everything above, plus a limited Phase II before you close. Phase II scope is set by what the Phase I finds.

from $9,850

Phase II priced on findings

Draft in 3-4 weeks

See what All-In covers

Not sure which level you need?

Get a tailored recommendation for your deal.

Tell us the level you're weighing and where to send it. An Environmental Professional reviews your situation and emails back whether that scope actually covers your liability — or whether you're buying more (or less) than you need. No obligation.

One email with your recommendation. No newsletter, no sales sequence.

Every property prices differently.

These are starting points. Acreage, prior use, region and how fast you need it all move the number. The Cost Estimator gives you a range built around your property, your service and your closing date — in under two minutes, no obligation.

Compare the levels side by side

Select a level to highlight it and flag what that upgrade adds. Every line links to the service that delivers it.

Starting prices are floors for a typical NY/NJ commercial property and are not a quote. A Desktop Review does not meet ASTM E1527-21 and confers no All Appropriate Inquiries protection. Additional scopes are provided for information only and are not initiated without separate written authorization.

Transparent pricing for SBA Due Diligence — get your site-specific estimate

Answer a few questions about your property and get a real price range in under 2 minutes. No sales call required.

  • Site-specific range
  • Under 2 minutes
  • No obligation
  • Emailed to you

Preliminary estimate only. Not an engineering quote.

Service inquiry form

Request a SBA Due Diligence Quote

Send the property address, NAICS code, and loan program. We'll confirm the required report level and return a fixed fee and delivery date within 2 business hours.

Project location

Type at least three characters to see address suggestions, then use the arrow keys to choose one.

Your information is confidential and routed only to our licensed project team.

Protected by reCAPTCHA — this site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

FAQ

SBA Due Diligence FAQs

Common questions from SBA lenders, CDCs, and loan officers scoping environmental due diligence.

Ready to move on SBA Due Diligence?

Send us the site details and we'll scope it, price it, and tell you honestly whether you need this work at all.