PFAS Assessment & Advisory
Defensible answers on emerging contaminants.
Screening, EPA 1633 sampling, and regulatory strategy for PFAS across NJ, NY, and the Northeast — built for real estate transactions, enforcement responses, and long-tail liability planning.
How an assessment runs
Four tracked stages from authorization to a lender-ready report.
- 01
Scope & kickoff
Same-business-day scope, fee range and delivery date.
Request a scope - 02
Findings & report
ASTM-conformant deliverable your lender and counsel can rely on.
Read the FAQs - 03
Common next step
The work most clients authorize once this closes out.
Asbestos & Lead Survey - 04
Start the engagement
Send the site details — we scope it and price it.
Start the engagement
Why PFAS Belongs on Every Deal Sheet
Expanding Liability
State standards are tightening quarterly. Pre-2020 acquisitions with historic AFFF, plating, or textile use can trigger post-closing PFAS costs that swamp the original deal economics.
Lender Expectations
Institutional lenders and insurers now request PFAS as a non-scope consideration in Phase I ESAs. Missing it can add weeks of re-scoping when the loan committee circles back.
Regulatory Momentum
NJDEP interim groundwater criteria, NYSDEC PFAS guidance, and federal EPA Method 1633 have created a defensible investigation pathway — but only if the sampling plan is built around them from day one.
PFAS Services
From transaction screening through remedial strategy, one LSRP-led team keeps your PFAS work defensible and cost-controlled.
PFAS Screening & Due Diligence
Buyers, lenders, and attorneys handling commercial or industrial property transactions where PFAS liability could impact deal terms or post-closing exposure.
Property-level PFAS risk screening for real estate transactions, acquisitions, and refinancing. Includes historical use review, regulatory database screening, and site-specific PFAS risk profile aligned to ASTM E1527-21 and EPA guidance on emerging contaminants.
What's Included
- Historical PFAS use & AFFF pathway review
- State & federal database screening (NJDEP, NYSDEC, EPA ECHO)
- Adjacent-site PFAS source identification
- Site-specific PFAS risk profile
- Transaction-ready findings letter
- Recommendations for Phase II sampling scope
PFAS Sampling & Laboratory Analysis
Sites with known or suspected PFAS impacts — former manufacturing, firefighting training, landfill, or AFFF-impacted properties — requiring defensible characterization.
Full PFAS sampling program including soil, groundwater, surface water, and drinking water analysis using EPA Method 1633 or 537.1. Sample plans align with NJDEP interim specific groundwater criteria and NYSDEC PFAS guidance for site characterization and closure pathways.
What's Included
- PFAS-specific sampling & QA/QC plan
- Soil, groundwater, & surface water sampling
- EPA Method 1633 / 537.1 laboratory analysis
- Comparison to NJDEP & NYSDEC screening levels
- Extent-of-impact evaluation & data validation
- Investigation report with regulatory recommendations
PFAS Regulatory Strategy & Remedial Advisory
Owners, insurers, and counsel navigating enforcement actions, cost-recovery litigation, or long-tail PFAS liability at industrial and legacy sites.
Strategic advisory for owners facing PFAS enforcement, receiver-of-notice letters, or evolving cleanup criteria. Includes remedial technology screening (GAC, ion exchange, foam fractionation), cost-to-close modeling, and NJDEP/NYSDEC negotiation support.
What's Included
- Regulatory position paper & agency correspondence
- Treatment technology screening (GAC, IX, foam fractionation)
- Cost-to-close modeling & remedial alternatives analysis
- NJDEP LSRP / NYSDEC negotiation support
- Cost-recovery & PRP allocation documentation
- Expert testimony support
LSRP-Led PFAS Programs
Every PFAS investigation is overseen by a Licensed Site Remediation Professional and coordinated with our regulatory affairs team. We track NJDEP and NYSDEC rulemaking so your sampling plan and cleanup strategy stay defensible as standards evolve.
PFAS Due Diligence Checklist
Emerging Contaminant Screening Guide
A property-level PFAS screening framework aligned to ASTM E1527-21 non-scope considerations and NJDEP/NYSDEC guidance.
Get Instant Access
Frequently Asked Questions
Transparent pricing for PFAS Assessment & Advisory — get your site-specific estimate
Answer a few questions about your property and get a real price range in under 2 minutes. No sales call required.
- Site-specific range
- Under 2 minutes
- No obligation
- Emailed to you
Preliminary estimate only. Not an engineering quote.
Service inquiry form
Request a Free Project Consultation
Tell us about your property and we'll respond with a tailored scope and pricing within 2 business hours.
Tell us about your site
A licensed engineer will get back to you the same business day.
Related Environmental Assessment Services
Projects rarely need one service in isolation. These are the scopes most often paired with this one.

Asbestos & Lead Paint Survey
Certified pre-demolition and pre-renovation asbestos and lead paint surveys for NYC and NJ properties.
Learn more
Vapor Intrusion Assessment
Sub-slab, indoor air, and vapor mitigation design per NJDEP and NYSDEC vapor intrusion guidance.
Learn more
UST Closure & Tank Removal
Underground storage tank removal, closure-in-place, and post-closure remediation for NYC and NJ.
Learn more
Groundwater Investigation & Monitoring
Monitoring well installation, aquifer testing, and long-term groundwater sampling programs.
Learn more
Ground Penetrating Radar (GPR) Survey
Non-destructive subsurface utility, tank, and structural GPR investigations.
Learn more
Phase I Environmental Site Assessment
ASTM E1527-21 Phase I Environmental Site Assessments satisfying All Appropriate Inquiries for NY/NJ property transactions.
Learn moreServices That Work Alongside PFAS Assessment & Advisory
Scopes our clients most often add to keep one schedule, one regulator conversation, and one point of accountability.

NJ ISRA Compliance
Industrial Site Recovery Act applicability, notice filings, transaction instruments, and LSRP-led closure for NJ industrial transfers.
Learn more
Waste Characterization & Disposal Profiling
RCRA hazardous waste determinations, TCLP profiling, facility approval, and disposal documentation.
Learn more
Remedial Cost Estimating & Disposal Optimization
Independent remediation cost models, disposal routing optimization, and contingency analysis for underwriting, budgeting, and negotiation.
Learn moreIndustries That Rely on PFAS Assessment & Advisory
See how teams across these sectors integrate pfas assessment & advisory into their projects, with regulator-ready deliverables and predictable timelines.

Developers
We understand your timeline pressures. Get Phase I ESAs that pass lender scrutiny the first time, with 1-week turnaround when you need it.
Explore industry
Industrial
Whether you're acquiring, developing, or operating industrial facilities, we provide the environmental expertise to protect your investment.
Explore industry
Pharma/Chemical
From RCRA compliance to legacy contamination, we help pharmaceutical and chemical companies manage environmental risk and regulatory obligations.
Explore industry
Law Firms
We provide environmental law firms with the technical analysis, expert opinions, and litigation support needed to build winning arguments.
Explore industry
Lenders
Protect your portfolio with lender-compliant environmental assessments. We deliver Phase I ESAs that meet SBA, FDIC, and institutional requirements, on your timeline.
Explore industryPFAS Assessment & Advisory Across the NY/NJ Metro Area
Licensed teams working locally — pick your market for regional regulators, turnaround times, and recent project work.


