
Site Management Plans
Post-Remedy Controls, O&M & Periodic Review
The document that governs a site after the remedy is built: excavation and soil-handling procedures, engineering and institutional control monitoring, vapor system O&M, and the periodic reporting that keeps a Certificate of Completion in good standing.
- 100% lender approval on Phase I ESAs
- 1-week priority Phase I turnaround
- Fixed-fee, same-day quotes
Free scoping call — fixed-fee quote with the scope locked before we start.
How a cleanup runs
From delineation through the regulator's sign-off letter.
- 01
Scope & kickoff
Same-business-day scope, fee range and delivery date.
Request a scope - 02
Delineate the impact
Define the extent so the remedy is sized to the problem.
See what's included - 03
Remedy design & approval
Work plan agencies accept the first time it is submitted.
When it applies - 04
Field work & closure
Oversight, documentation and the closure letter on file.
Read the FAQs - 05
Common next step
The work most clients authorize once this closes out.
NYSDEC BCP - 06
Start the engagement
Send the site details — we scope it and price it.
Start the engagement
What's Included in an Envicon Site Management Plans Engagement
SMP Preparation & Agency Approval
Institutional and engineering control plan, monitoring plan, and operation and maintenance plan compiled into an SMP that NYSDEC or NJDEP will approve without a second review cycle.
Soil & Materials Management Procedures
Excavation work plans, cover-system repair procedures, stockpile and characterization protocols, and contractor-facing guidance for future ground disturbance.
Engineering Control O&M
Sub-slab depressurization system monitoring, cover-system inspection, and groundwater monitoring programs with corrective-action triggers.
Periodic Review Reports & Certifications
Annual site inspections, IC/EC certifications, and Periodic Review Report submission to keep the remedy and its liability protections intact.
When a Site Management Plan Is Required
- A BCP or VCP remedy left residual contamination in place
- An environmental easement or deed notice restricts site use
- A sub-slab depressurization system needs ongoing O&M
- Ground disturbance is planned at a previously remediated site
- A periodic review certification deadline is approaching
- A new owner inherited a site with unclear ongoing obligations
Remedy closed but the SMP still outstanding?
Send the remedial documents and we'll return a Site Management Plan scope, an agency-review timeline, and a fixed fee.
Pairs Naturally With

NYSDEC BCP
The BCP remedy whose Certificate of Completion the SMP protects.
Explore service
Vapor Intrusion Assessment
Vapor mitigation system design and monitoring covered under the SMP's O&M plan.
Explore service
Waste Characterization
Profiling and disposal of soil generated during SMP-governed excavation.
Explore serviceSite Management Plans Past Performance
Representative projects from our NY/NJ portfolio.

BICC Cables Site DCU Area 2B Sediment Remediation
Innovative sediment remediation for a 17-acre Hudson River waterfront site under the NYSDEC Brownfield Cleanup Program, resolving PCB contamination after six previous unsuccessful remediation attempts.
View Case Study
Woodbridge Energy Center Brownfields Redevelopment
Brownfield site redevelopment of a former chemical manufacturing facility along the Raritan River, supporting construction of a new gas-fired power plant through comprehensive geotechnical design and environmental remediation.
View Case Study
Former ATI Tank Farm Redevelopment Site
Environmental engineering and remedial design for a 2.8-acre former Major Oil Storage Facility on the Hudson River, supporting entry into New York State's Brownfield Cleanup Program for mixed-use redevelopment.
View Case StudyTransparent pricing for Site Management Plans — get your site-specific estimate
Answer a few questions about your property and get a real price range in under 2 minutes. No sales call required.
- Site-specific range
- Under 2 minutes
- No obligation
- Emailed to you
Preliminary estimate only. Not an engineering quote.
Service inquiry form
Request a Site Management Plans Quote
Tell us the site, the remedy that was implemented, and the controls in place. We'll scope the plan or the annual compliance work.
Site Management Plans FAQs
Questions from owners and property managers holding remediated sites.
Ready to move on Site Management Plans?
Give us the remedy record and we'll draft the SMP and periodic review package your agency reviewer expects.
Related Remediation & Brownfield Services
Projects rarely need one service in isolation. These are the scopes most often paired with this one.

Soil Disposal & Clean Fill Certification
Waste characterization, clean fill certification, and full-service soil management for construction and remediation sites.
Learn more
Sediment & Waterfront Remediation
Sediment characterization, capping, and waterfront/MGP legacy-site remediation.
Learn more
NJ LSRP Services
Licensed Site Remediation Professional services for NJDEP-regulated site closure.
Learn more
NYSDEC Brownfield Cleanup Program (BCP)
BCP application, remedial investigation, RAWP implementation, and Certificate of Completion support for New York brownfield sites.
Learn more
Vapor Intrusion Mitigation System Design
Sub-slab depressurization and vapor barrier system design, installation oversight, and post-mitigation verification per NJDEP and NYSDEC vapor intrusion guidance.
Learn more
Waste Characterization & Disposal Profiling
RCRA hazardous waste determinations, TCLP profiling, facility approval, and disposal documentation.
Learn moreServices That Work Alongside Site Management Plans
Scopes our clients most often add to keep one schedule, one regulator conversation, and one point of accountability.

Vapor Intrusion Assessment
Sub-slab, indoor air, and vapor mitigation design per NJDEP and NYSDEC vapor intrusion guidance.
Learn more
Groundwater Investigation & Monitoring
Monitoring well installation, aquifer testing, and long-term groundwater sampling programs.
Learn more
Environmental Compliance Audit
Standard and pre-inspection compliance audits plus annual compliance programs.
Learn moreSite Management Plans Projects in the NY/NJ Metro
Case studies matched to this scope by the services delivered, the site conditions, and the market the work was performed in.



Industries That Rely on Site Management Plans
See how teams across these sectors integrate site management plans into their projects, with regulator-ready deliverables and predictable timelines.

Developers
We understand your timeline pressures. Get Phase I ESAs that pass lender scrutiny the first time, with 1-week turnaround when you need it.
Explore industry
Industrial
Whether you're acquiring, developing, or operating industrial facilities, we provide the environmental expertise to protect your investment.
Explore industry
Public Agencies
From on-call task orders to major capital projects, we help municipalities and public agencies deliver infrastructure that serves communities.
Explore industry
Law Firms
We provide environmental law firms with the technical analysis, expert opinions, and litigation support needed to build winning arguments.
Explore industry
Contractors
From pre-bid geotechnical data to construction-phase environmental monitoring, we help contractors deliver projects on time and within compliance.
Explore industrySite Management Plans Across the NY/NJ Metro Area
Licensed teams working locally — pick your market for regional regulators, turnaround times, and recent project work.


