Woodbridge Energy Center Brownfields Redevelopment

Woodbridge Township, Middlesex County, New Jersey36 monthsEPEC Polymers/USA Environment LP

Brownfield site redevelopment of a former chemical manufacturing facility along the Raritan River, supporting construction of a new gas-fired power plant through comprehensive geotechnical design and environmental remediation.

Woodbridge Energy Center Brownfields Redevelopment

Project Overview

The Former Nuodex Corporation Site served as a chemical manufacturing facility but had been vacant for several years due to ongoing environmental issues. NJDEP regulatory timeframes and the proposed construction of a new gas-fired power plant at the Site were drivers in the decision to address the environmental issues and redevelop the Site. Located along the Raritan River, the project required comprehensive geotechnical and environmental solutions to enable successful redevelopment.

The Challenge

The Site exhibited many design challenges due to high levels of contamination in soil and groundwater, soil composition unfavorable for supporting future development, and mandatory restoration of a large acreage of tidally influenced wetlands. Envicon was also tasked with designing 13 acres of deep-water pond to serve as habitat for native species while managing the majority of the Site's surface water runoff.

Our Solution

Envicon's team first provided design and construction phase services supporting construction of a Hydraulic Barrier Wall Working Platform to mitigate poor soil conditions prohibiting heavy equipment operation. Envicon's team then provided geotechnical design and construction oversight for the 7,043-foot-long low-permeability hydraulic barrier wall to prevent horizontal migration of Site contaminants. Envicon's team confirmed geotechnical quality and oversaw placement of over 1,000,000 cubic yards of imported fill materials providing the foundation for a two-foot-thick Site-wide soil cap serving as the vertical barrier for contaminant migration. Envicon's team has since designed and overseen construction of the 13-acre, 10,000,000-gallon geomembrane-lined wetland pond; 2-acre groundwater treatment facility site layout and foundations; and 5-acre, 40-foot-high contaminated soil stockpile with 4-foot-thick cap.

Key Highlights

  • Designed and oversaw Hydraulic Barrier Wall Working Platform construction
  • Provided geotechnical design for 7,043-foot low-permeability hydraulic barrier wall
  • Oversaw placement of over 1,000,000 cubic yards of imported fill materials
  • Designed two-foot-thick Site-wide soil cap as vertical contaminant barrier
  • Designed 13-acre, 10,000,000-gallon geomembrane-lined wetland pond
  • Designed 2-acre groundwater treatment facility layout and foundations
  • Designed 5-acre, 40-foot-high contaminated soil stockpile with 4-foot cap

Results Achieved

  • Enabled successful gas-fired power plant construction
  • Prevented horizontal contaminant migration with 7,043-foot barrier wall
  • Created 13 acres of native species wetland habitat
  • Managed Site surface water runoff through engineered pond system
  • Addressed NJDEP regulatory requirements for Site redevelopment

Key Metrics

0
Barrier Wall Length
ft
0+
Fill Material Placed
CY
0
Wetland Pond Capacity
gal
0
Wetland Habitat Created
acres

"The scale and complexity of this brownfield remediation required exceptional engineering expertise. Envicon delivered innovative solutions that enabled our power plant construction to proceed on schedule."

E
Environmental Program ManagerVP of Environmental Affairs, EPEC Polymers

Project Details

Client

EPEC Polymers/USA Environment LP

Location

Woodbridge Township, Middlesex County, New Jersey

Duration

36 months

Scope

Brownfield site redevelopment with geotechnical design and environmental remediation for gas-fired power plant construction

Services Provided

Brownfield Site Redevelopment
Geotechnical Design
Construction Phase Services
Hydraulic Barrier Wall Design
Environmental Remediation
Wetland Restoration Design
Groundwater Treatment Facility Design
Construction Oversight
Contaminated Soil Management

Share this case study

Transparent pricing for Site Remediation & Brownfield Redevelopment

Answer a few questions about your property and get a real price range in under 2 minutes. No sales call required.

  • Site-specific range
  • Under 2 minutes
  • No obligation
  • Emailed to you

Preliminary estimate only. Not an engineering quote.

FAQ

Woodbridge Energy Center Brownfields Redevelopment — Frequently Asked Questions

Common questions about the scope, challenges, and outcomes of this Woodbridge Township, Middlesex County, New Jersey case study.

Have a Similar brownfield? Get a Free Quote

100% lender approval across 350+ Phase I ESAs · 21+ years in the NY/NJ metro market. Same-business-day scoping for NY & NJ owners, lenders, and developers.

Request a Quote for Your Site

Tell us about the property and we'll come back the same business day with scope, schedule, and fee.

Project location

Type at least three characters to see address suggestions, then use the arrow keys to choose one.

Your information is confidential and routed only to our licensed project team.

Protected by reCAPTCHA — this site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Call Now