I-80 over Route 17 Bridge Replacement
Structural design of a skewed multi-span bridge replacement to maintain continuous operations on a critical NJ corridor for NJDOT.
Project Overview
Structural design of a skewed multi-span bridge replacement to maintain continuous operations on a critical New Jersey corridor. The project required developing crane access plans, erection sequencing, and traffic-maintenance strategies.
The Challenge
Replacing a skewed, multi-span superstructure while maintaining uninterrupted traffic and minimizing staging impacts on a critical transportation corridor.
Our Solution
Developed crane access plans, erection sequencing, and traffic-maintenance strategies. Evaluated superstructure alternatives for cost and constructability optimization and delivered complete design packages in accordance with NJDOT standards.
Key Highlights
- Designed skewed multi-span bridge replacement
- Developed crane access and erection sequencing plans
- Created traffic-maintenance strategies
- Evaluated superstructure alternatives
- Delivered NJDOT-compliant design packages
Results Achieved
- Maintained continuous traffic operations
- Optimized cost and constructability
- Minimized staging impacts
- Delivered complete design documentation
Project Details
Client
NJDOT
Location
New Jersey
Duration
24 months
Scope
Structural design for skewed bridge replacement on I-80
Services Provided
Share this case study
Related Services


You May Also Need
Bridge Engineering
Matches “design” scope
NBIS inspection, load rating, rehabilitation and replacement design, and construction-phase engineering for NY/NJ structures.
Structural & Transportation
Matches “structural” scope
Structural and transportation engineering for bridge, highway, and transit assets.
BIM & Civil 3D
Matches “design” scope
Civil 3D corridor and grading models, BIM coordination, and clash detection that tie survey, subsurface, and design data into one buildable model.
Civil Engineering
Matches “construction” scope
Site, grading, utility, stormwater, and construction-phase civil engineering across New York and New Jersey.
Where We Work Nearby
I-80 over Route 17 Bridge Replacement — Frequently Asked Questions
Common questions about the scope, challenges, and outcomes of this New Jersey case study.
Similar Projects
Have a Similar structural? Get a Free Quote
100% lender approval across 350+ Phase I ESAs · 21+ years in the NY/NJ metro market. Same-business-day scoping for NY & NJ owners, lenders, and developers.
Request a Quote for Your Site
Tell us about the property and we'll come back the same business day with scope, schedule, and fee.