Route 82 Bridge Replacements
Construction management for prefabricated steel and concrete bridge replacements (~$25M) on H-pile foundations for the Connecticut Department of Transportation.
Project Overview
Construction management for prefabricated steel and concrete bridge replacements totaling approximately $25 million on H-pile foundations for the Connecticut Department of Transportation. The project required executing accelerated bridge construction while maintaining QA/QC adherence and minimizing roadway impacts.
The Challenge
Executing accelerated bridge construction while maintaining QA/QC adherence and minimizing roadway impacts for CTDOT.
Our Solution
Managed construction sequencing, coordinated with CTDOT engineers and contractors, and oversaw QA/QC for prefab components and field integration, enabling efficient installation and minimal operational disruption.
Key Highlights
- Managed $25M prefabricated bridge replacements
- Coordinated accelerated bridge construction
- Oversaw QA/QC for prefab components
- Managed construction sequencing and staging
- Coordinated with CTDOT and contractors
Results Achieved
- Completed accelerated bridge construction
- Minimized roadway impacts during installation
- Maintained QA/QC adherence throughout
- Achieved efficient prefab integration
Project Details
Client
CTDOT
Location
Connecticut
Duration
18 months
Scope
Construction management for prefabricated bridge replacements
Services Provided
Share this case study
Related Services


You May Also Need
Structural & Transportation
Matches “structural” scope
Structural and transportation engineering for bridge, highway, and transit assets.
Bridge Engineering
Matches “construction” scope
NBIS inspection, load rating, rehabilitation and replacement design, and construction-phase engineering for NY/NJ structures.
Civil Engineering
Matches “construction” scope
Site, grading, utility, stormwater, and construction-phase civil engineering across New York and New Jersey.
Construction Management
Matches “construction” scope
Owner-side construction management, resident engineering, cost and schedule control, and closeout documentation.
Where We Work Nearby
Route 82 Bridge Replacements — Frequently Asked Questions
Common questions about the scope, challenges, and outcomes of this Connecticut case study.
Similar Projects
Have a Similar structural? Get a Free Quote
100% lender approval across 350+ Phase I ESAs · 21+ years in the NY/NJ metro market. Same-business-day scoping for NY & NJ owners, lenders, and developers.
Request a Quote for Your Site
Tell us about the property and we'll come back the same business day with scope, schedule, and fee.