11th Street Boutique Hotel Construction
Remedial design and construction oversight for an 11-story boutique hotel on a site impacted by petroleum and heavy-metal-contaminated soils, including UST removal and soil management.

Project Overview
This Manhattan boutique hotel development required comprehensive environmental management throughout construction on a site with historical petroleum and heavy metal contamination. Envicon's team provided complete remedial design and construction oversight services to ensure the project could proceed while properly managing environmental risks.
The Challenge
The urban infill site contained petroleum-impacted soils and heavy metal contamination from previous uses, along with an abandoned underground storage tank requiring removal. The tight urban site conditions and aggressive construction schedule required innovative approaches to soil management and waste disposal.
Our Solution
Envicon's team developed a comprehensive soil and material management plan that maximized beneficial reuse opportunities while ensuring proper characterization and disposal of contaminated materials. Value engineering approaches reduced disposal costs while maintaining full regulatory compliance.
Key Highlights
- Managed contaminated soil excavation activities throughout construction
- Developed soil/material management plan and waste characterization sampling
- Oversaw UST removal and closure reporting
- Value engineering reduced disposal costs through beneficial reuse
- Coordinated disposal facility approvals and volume tracking
Results Achieved
- Successful completion of 11-story hotel construction
- Reduced disposal costs through beneficial reuse program
- Achieved regulatory closure for UST removal
- Maintained construction schedule throughout environmental work
Project Details
Client
Boutique Hotel Developer
Location
New York, NY
Duration
16 months
Scope
Environmental management and remedial oversight for boutique hotel construction
Services Provided
Related Services
Remediation & Brownfield
Fast-track site cleanup with rapid turnaround on regulatory submittals. Transform contaminated properties into lender-ready assets.
Environmental Assessment
Lender-ready Phase I/II ESAs with 1-week turnaround. Comprehensive due diligence that banks approve the first time.
You May Also Need
Soil Disposal
Matches “remediation” scope
Waste characterization, clean fill certification, and full-service soil management for construction and remediation sites.
Phase II ESA
Matches “environmental” scope
Subsurface investigation of soil, groundwater, and soil gas to NJDEP and NYSDEC protocols following a Phase I REC.
UST Closure
Matches “remediation” scope
Underground storage tank removal, closure-in-place, and post-closure remediation for NYC and NJ.
Bridge Engineering
Matches “design” scope
NBIS inspection, load rating, rehabilitation and replacement design, and construction-phase engineering for NY/NJ structures.
Where We Work Nearby
11th Street Boutique Hotel Construction — Frequently Asked Questions
Common questions about the scope, challenges, and outcomes of this New York, NY case study.
Similar Projects
Have a Similar remediation? Get a Free Quote
100% lender approval across 350+ Phase I ESAs · 20+ years in the NY/NJ metro market. Same-business-day scoping for NY & NJ owners, lenders, and developers.
Request a Quote for Your Site
Tell us about the property and we'll come back the same business day with scope, schedule, and fee.