11th Street Boutique Hotel Construction

New York, NY16 monthsBoutique Hotel Developer

Remedial design and construction oversight for an 11-story boutique hotel on a site impacted by petroleum and heavy-metal-contaminated soils, including UST removal and soil management.

11th Street Boutique Hotel Construction

Project Overview

This Manhattan boutique hotel development required comprehensive environmental management throughout construction on a site with historical petroleum and heavy metal contamination. Envicon's team provided complete remedial design and construction oversight services to ensure the project could proceed while properly managing environmental risks.

The Challenge

The urban infill site contained petroleum-impacted soils and heavy metal contamination from previous uses, along with an abandoned underground storage tank requiring removal. The tight urban site conditions and aggressive construction schedule required innovative approaches to soil management and waste disposal.

Our Solution

Envicon's team developed a comprehensive soil and material management plan that maximized beneficial reuse opportunities while ensuring proper characterization and disposal of contaminated materials. Value engineering approaches reduced disposal costs while maintaining full regulatory compliance.

Key Highlights

  • Managed contaminated soil excavation activities throughout construction
  • Developed soil/material management plan and waste characterization sampling
  • Oversaw UST removal and closure reporting
  • Value engineering reduced disposal costs through beneficial reuse
  • Coordinated disposal facility approvals and volume tracking

Results Achieved

  • Successful completion of 11-story hotel construction
  • Reduced disposal costs through beneficial reuse program
  • Achieved regulatory closure for UST removal
  • Maintained construction schedule throughout environmental work

Project Details

Client

Boutique Hotel Developer

Location

New York, NY

Duration

16 months

Scope

Environmental management and remedial oversight for boutique hotel construction

Services Provided

Remedial Design
Construction Oversight
Environmental Engineering
UST Removal
Soil Management

Share this case study

Transparent pricing for Site Remediation & Brownfield Redevelopment

Answer a few questions about your property and get a real price range in under 2 minutes. No sales call required.

  • Site-specific range
  • Under 2 minutes
  • No obligation
  • Emailed to you

Preliminary estimate only. Not an engineering quote.

FAQ

11th Street Boutique Hotel Construction — Frequently Asked Questions

Common questions about the scope, challenges, and outcomes of this New York, NY case study.

Have a Similar remediation? Get a Free Quote

100% lender approval across 350+ Phase I ESAs · 21+ years in the NY/NJ metro market. Same-business-day scoping for NY & NJ owners, lenders, and developers.

Request a Quote for Your Site

Tell us about the property and we'll come back the same business day with scope, schedule, and fee.

Project location

Type at least three characters to see address suggestions, then use the arrow keys to choose one.

Your information is confidential and routed only to our licensed project team.

Protected by reCAPTCHA — this site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Call Now