Skip to main content
Envicon Group
1–2 Week Turnaround
Starting at $3,500
NJDEP & NYSDEC Compliant

Vapor Intrusion Assessment
Protect Indoor Air Quality.

Comprehensive vapor intrusion screening, sub-slab sampling, and mitigation design to protect building occupants and satisfy regulatory requirements in New York and New Jersey.

Licensed P.E. & LSRP on Staff ASTM E2600 Certified TO-15 Lab Analysis 4.9 Google Rating

Why Vapor Intrusion Matters

Health Risk

Volatile organic compounds (VOCs) migrating from contaminated soil or groundwater into buildings pose serious health risks including cancer. NJDEP and EPA mandate assessment when contamination is nearby.

Transaction Requirements

Lenders and environmental attorneys increasingly require vapor intrusion assessments as part of Phase II ESAs. Missing this step can delay closings or create post-transaction liability.

Regulatory Compliance

NJDEP Vapor Intrusion Guidance (2021) and NYC OER requirements mandate assessment and mitigation for properties near contaminated sites. Non-compliance can result in enforcement actions.

Vapor Intrusion Services

From initial screening through full mitigation system design, one team, one project manager, complete regulatory compliance.

Vapor Intrusion Screening

Property buyers and lenders who need a quick risk assessment before committing to full investigation during real estate transactions.

Price$3,500–$6,000
Turnaround1–2 Weeks

Initial vapor encroachment screening per ASTM E2600 to determine if a vapor intrusion pathway exists. Includes review of historical records, groundwater data, and subsurface conditions to assess risk before committing to full investigation.

What's Included

  • ASTM E2600 vapor encroachment screening
  • Historical land use & regulatory database review
  • Groundwater & soil contamination pathway analysis
  • Risk determination report with recommendations
  • Vapor intrusion likelihood ranking (Tier 1)
  • Go/no-go recommendation for sub-slab sampling

Sub-Slab & Indoor Air Sampling

Properties with known or suspected subsurface contamination where volatile organic compounds may be migrating into occupied buildings.

Price$6,000–$12,000
Turnaround2–3 Weeks

Full vapor intrusion investigation including sub-slab soil vapor probes, indoor/outdoor ambient air sampling, and laboratory analysis for VOCs, TCE, PCE, and other target compounds. Results compared against NJDEP Vapor Intrusion Screening Levels (VISLs) and EPA guidelines.

What's Included

  • Sub-slab vapor probe installation (3–6 points typical)
  • Indoor & outdoor ambient air sampling
  • TO-15 laboratory analysis for VOCs
  • Comparison to NJDEP VISLs & EPA screening levels
  • Vapor intrusion investigation report
  • Regulatory agency correspondence & filing

Vapor Mitigation System Design

Building owners and developers requiring active vapor mitigation systems to meet regulatory compliance and protect occupant health.

Price$12,000–$35,000
Turnaround4–8 Weeks

Complete vapor mitigation design including sub-slab depressurization systems (SSDS), vapor barriers, and engineering controls. Includes system design, installation oversight, post-installation verification testing, and long-term monitoring plans required by NJDEP and NYSDEC.

What's Included

  • Sub-slab depressurization system (SSDS) design
  • Vapor barrier specification & installation oversight
  • Engineering control design per NJDEP/NYSDEC standards
  • Post-installation verification sampling
  • Long-term monitoring plan development
  • Operation & maintenance manual

LSRP-Managed Investigations

Every vapor intrusion assessment is overseen by a Licensed Site Remediation Professional (LSRP) and follows NJDEP Vapor Intrusion Technical Guidance. We handle all agency correspondence, sampling protocols, and regulatory filings.

Free Download

NY/NJ Compliance Permit Matrix

Vapor Intrusion & Indoor Air Reference

Quick-reference guide to vapor intrusion screening levels, sub-slab sampling protocols, and NJDEP/NYSDEC mitigation requirements.

NJDEP VISL & EPA screening level tables
Sub-slab vs indoor air sampling decision tree
SSDS design checklist
Regulatory filing & closure pathway
PDF Guide • Sent to your email

Get Instant Access

By submitting, you agree to receive relevant industry updates.

This document is for informational purposes only and does not constitute professional engineering advice. For project-specific guidance, contact a licensed professional engineer.

Transparent pricing for Vapor Intrusion Assessment — get your site-specific estimate

Answer a few questions about your property and get a real price range in under 2 minutes. No sales call required.

  • Site-specific range
  • Under 2 minutes
  • No obligation
  • Emailed to you

Preliminary estimate only. Not an engineering quote.

Service inquiry form

Request a Free Project Consultation

Tell us about your property and we'll respond with a tailored scope and pricing within 2 business hours.

Project location

Type at least three characters to see address suggestions, then use the arrow keys to choose one.

Your information is confidential and routed only to our licensed project team.

Protected by reCAPTCHA — this site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Frequently Asked Questions

Vapor Intrusion Assessment Questions

Get answers to common questions about our vapor intrusion assessment services, turnaround times, and deliverables.

Tell us about your site

A licensed engineer will get back to you the same business day.

Find us on Google
Project Location

Type at least three characters to see address suggestions, then use the arrow keys to choose one.

Call Now