Skip to main content
Envicon Group
Results in 3–5 Days
Starting at $800
AHERA & EPA Certified

Asbestos & Lead Paint Surveys
Fast. Certified. Compliant.

Don't let hazardous materials delay your project. Our certified inspectors deliver DOB and EPA-compliant survey reports in 3–5 days so you can proceed with demolition, renovation, or closing.

AHERA Accredited EPA Certified Inspectors 500+ projects completed 4.9 Google Rating

Why You Need an Asbestos & Lead Survey

Legal Requirement

NYC DOB and NJDEP require asbestos surveys before any demolition or renovation of pre-1980 buildings. Fines start at $10,000 per violation.

Real Estate Closings

Lenders and buyers require lead paint disclosures for pre-1978 properties. A clean report accelerates your closing timeline.

Worker & Tenant Safety

OSHA requires employers to identify ACM before disturbing building materials. Protect your workers and avoid costly stop-work orders.

Choose the Right Survey for Your Project

All surveys include certified lab analysis, regulatory-compliant reporting, and a follow-up call to review findings.

Pre-Demolition Asbestos Survey

Contractors, developers, and building owners planning demolition or renovation of pre-1980 structures.

Price$800–$1,500
Turnaround3–5 Days

Required before any demolition or renovation of pre-1980 buildings in NYC and NJ. Our AHERA-accredited inspectors collect bulk samples, send them to an accredited lab, and deliver a survey report that satisfies DOB, NJDEP, and OSHA requirements.

What's Included

  • AHERA-accredited building inspection
  • Bulk sampling of suspect materials
  • NVLAP-accredited lab analysis (PLM/TEM)
  • Detailed survey report with material locations
  • Abatement recommendations if ACM found
  • DOB/NJDEP-compliant documentation

Lead Paint Inspection & Risk Assessment

Property managers, landlords, childcare facility operators, and buyers of pre-1978 properties.

Price$600–$1,200
Turnaround3–5 Days

EPA-certified lead paint inspections for residential and commercial properties. Required for HUD compliance, real estate transactions involving pre-1978 buildings, and childcare facilities. XRF testing provides instant field results.

What's Included

  • EPA-certified lead inspector on-site
  • XRF (X-Ray Fluorescence) testing of all surfaces
  • Paint chip sampling where needed
  • Risk assessment with hazard prioritization
  • Clearance testing post-abatement (if needed)
  • HUD/EPA-compliant inspection report

Combined Asbestos & Lead Survey

Developers and GCs tackling full-building renovations or demolitions who want one contractor to handle both inspections.

Price$1,200–$2,500
Turnaround3–5 Days

The most cost-effective approach: a single site visit covers both asbestos and lead paint inspections. One mobilization, one report, one point of contact. Saves 20–30% vs. booking separately.

What's Included

  • Combined asbestos + lead inspection in one visit
  • Full building survey for ACM and LBP
  • Lab analysis for both materials
  • Unified report with remediation recommendations
  • Regulatory compliance documentation (DOB, EPA, NJDEP)
  • Project manager assigned for follow-up questions

Certified Results You Can Trust

Every survey is performed by AHERA-accredited and EPA-certified inspectors. Lab analysis is conducted by NVLAP-accredited laboratories. Reports are accepted by NYC DOB, NJDEP, EPA, and all major lenders.

Free Download

Asbestos & Lead Pre-Renovation Checklist

AHERA, OSHA & EPA RRP Compliance

Pre-renovation hazardous materials survey requirements covering AHERA inspections, OSHA respirable standards, and EPA Renovation, Repair & Painting Rule.

Pre-renovation survey trigger checklist
Sampling protocols for ACM & LBP
Worker protection & abatement requirements
NYC DEP & NJDEP filing references
PDF Guide • Sent to your email

Get Instant Access

By submitting, you agree to receive relevant industry updates.

This document is for informational purposes only and does not constitute professional engineering advice. For project-specific guidance, contact a licensed professional engineer.

Transparent pricing for Asbestos & Lead Paint Survey — get your site-specific estimate

Answer a few questions about your property and get a real price range in under 2 minutes. No sales call required.

  • Site-specific range
  • Under 2 minutes
  • No obligation
  • Emailed to you

Preliminary estimate only. Not an engineering quote.

Service inquiry form

Request a Free Project Consultation

Tell us about your property and we'll respond with a tailored scope and pricing within 2 business hours.

Project location

Type at least three characters to see address suggestions, then use the arrow keys to choose one.

Your information is confidential and routed only to our licensed project team.

Protected by reCAPTCHA — this site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Frequently Asked Questions

Asbestos & Lead Paint Survey Questions

Get answers to common questions about our asbestos & lead paint survey services, turnaround times, and deliverables.

Call Now