After a Response Action Outcome, the remedial work may be complete, but the project still needs its Remedial Action Permit. That application is where files can stall: missing records, inconsistent certifications, and unsupported deviations can hold up permit issuance.
On September 28, 2026, NJDEP announced Version 1.3 of the RAP Initial/New Media Component Application and added a mandatory Section N for expedited review screening. The requirement applies to all new applications, even when a case might otherwise qualify for the LSRP Supplemental Certification Application process. For new applications, NJDEP says no separate LSRP Supplemental Certification Application is required. Read the NJDEP announcement.
There is an important form-navigation detail: Section N is Supplemental Information, including certifications. Section O is “Other Information Provided,” where applicants explain professional-judgment justifications, compliance options, and variances. Don’t treat these sections as interchangeable.
What changed in RAP Version 1.3
NJDEP’s September 28 notice says the application now includes Section N, titled “Supplemental Certification.” It brings certification statements into the RAP application so NJDEP can evaluate new submissions for expedited review. As the agency put it, “All new applications will be evaluated for expedited review based on the information and certification statements provided in Section N.” That is an evaluation for expedited review, not a guarantee of an expedited decision.
The updated form supports initial RAP applications and applications to add a new media component to an existing RAP. The form organizes requirements by soil, groundwater, and indoor air, with sections that apply across media and sections that apply only to a specific component. Use the Version 1.3 application and its Version 1.3 instructions. Check the date and version before assembling the final package.
This form update sits within a wider regulatory change. NJDEP adopted amendments to the ARRCS rules in November 2025, with applicable RAP provisions under N.J.A.C. 7:26C-7 taking effect February 15, 2026. The updated rules reworked the RAP framework around media components and include the Indoor Air Notification Area (IANA) as an institutional control for applicable indoor-air cases. Review the NJDEP ARRCS rules and adoption materials alongside the current application and instructions.
What Section N asks the certifying parties to confirm
Section N is not just a signature page. It collects general and media-specific certifications tied to the application and supporting records. The current form includes certifications addressing:
- Required RAP supporting documents and affected receptors.
- Whether the remedial action protects public health and the environment.
- Financial assurance and any alternative remediation standards.
- Soil remedy, deed notice or notice in lieu, delineation, engineering controls, and the migration-to-groundwater pathway.
- Groundwater remedy, delineation, contaminant trends, plume behavior, product, and the monitoring well network.
- Indoor-air remedy, vapor intrusion investigations, mitigation verification, and the operation, maintenance, and monitoring plan.
Complete the parts that apply to the media included in the application. A soil-only submission does not need unrelated groundwater certifications, but it still needs the applicable general and soil certifications. The certifications must align with the Remedial Action Report (RAR), supporting records, and the selected RAP components.

For a groundwater component, for example, the certification about a sufficient monitoring network should match the submitted Ground Water Monitoring Plan and the underlying monitoring data. For an indoor-air component, the certification about nearby buildings and vapor intrusion investigation should be consistent with the investigation record and applicable plans.
Section N also reinforces accountability. The PRCR, current owner, and LSRP have separate certification roles in the application. Confirm who is authorized to sign for each party early. A technical consultant cannot simply sign on behalf of the owner or PRCR because they prepared the form.
What belongs in Section O
Section O, not Section N, is where the form asks for “Other Information Provided.” The instructions identify examples such as professional-judgment justifications, compliance averaging, and variances from rules or guidance. Use it to explain relevant issues that the form’s yes/no responses cannot fully address.
A useful Section O explanation should make the reviewer’s task straightforward:
- Identify the exact issue. Name the applicable question, area of concern, media component, and requirement.
- State the basis for the position. Explain the site-specific facts and professional judgment behind the response.
- Show where the record supports it. Cite the RAR section, table, figure, map, or data set.
- Explain protectiveness. Describe how the chosen approach protects people and the environment despite the variance or alternative.
- Provide supporting material. Include the calculations, field evidence, or agency correspondence that substantiates the explanation.
“Not applicable” or “see RAR” without a clear cross-reference usually leaves work for the reviewer. If the LSRP cannot make a Section N certification accurately, the form instructions direct the LSRP to provide justification in Section O. That explanation should resolve the issue, not obscure it.
A weak professional-judgment explanation can undermine expedited review. If the reviewer cannot verify the basis for a certification or variance, the application may need clarification or move through standard review. Project teams should account for the possibility of a 90-day queue as a schedule risk, not treat that timeframe as a promised NJDEP processing standard.
Common completeness problems to catch before submission
In Newark and across New Jersey, many avoidable delays begin with a gap between the form and the supporting record. Before submission, check for:
- An outdated form. Use Version 1.3 for a new application submitted under the September 28 update.
- Section N left incomplete. Complete the applicable certifications for every media component in the application.
- A separate supplemental certification submitted unnecessarily. NJDEP says it is not required for new applications.
- Section N and O mixed up. Put certifications in N and supporting narrative, variance, or professional-judgment explanations in O.
- Unclear references to the RAR. Give specific sections, tables, figures, and maps, not a general reference to the report.
- Missing or inconsistent attachments. Check the Section F requirements for applicable sampling summaries, data packages, maps, plans, notices, and GIS deliverables.
- Application details that do not match the record. Verify site identity, media selection, existing RAP information for a new media component, and the relevant submission identifiers.
- Missing signatures or authorization. Coordinate signatures from the PRCR, current owner, and LSRP before the package is ready to file.
- An existing RAP that is not in compliance. For new-media applications, resolve applicable fees and outstanding permit submittals before assuming NJDEP can process the addition.

Keep the permit path connected to the project
A RAP application is not an isolated form-filling exercise. The application, RAR, monitoring plans, institutional controls, and certifications need to tell the same technical story. That is especially important when an application involves multiple media, an existing permit, or a professional-judgment variance.
For projects involving remediation and brownfield support, we coordinate LSRP-led case management, permit documentation, and regulatory follow-through. On a Newark project, that means connecting the technical record to the application requirements and keeping the team aligned on what NJDEP needs to review. Our work also supports projects throughout the New Jersey market.
A national firm may route a RAP through a forms team several states away. Envicon’s LSRP-facing team works directly with the project record and regulatory requirements, and prepares Section O explanations that are specific, traceable, and built to withstand NJDEP review. No consultant can promise acceptance on the first review. Clear documentation and direct accountability give the application a stronger foundation.
Practical takeaway
For every new NJDEP RAP Initial/New Media Component Application in 2026, start with Version 1.3, complete the applicable Section N certifications, and do not file a separate LSRP Supplemental Certification Application. Use Section O for professional-judgment justifications, compliance options, and variances. Tie each explanation to the RAR and supporting evidence.
The distinction matters: Section N certifies. Section O explains. Get both right, and you give the permit review a clear path forward.
Frequently asked questions
Is Section N required for every new RAP application in 2026?
Yes. NJDEP’s September 28, 2026 notice says Section N must be completed for all new RAP Initial/New Media Component Applications, regardless of whether the case otherwise meets the LSRP Supplemental Certification Application criteria.
Do I need to submit a separate LSRP Supplemental Certification Application?
No. NJDEP says a separate LSRP Supplemental Certification Application is not required for new RAP applications under the updated process.
Does Section N contain the professional-judgment justification?
The form separates these functions. Section N contains supplemental certifications. Section O, titled “Other Information Provided,” is where the applicant can explain professional-judgment justifications, compliance averaging, and variances from rules or guidance.
Does completing Section N guarantee expedited review?
No. NJDEP evaluates new applications for expedited review based on the information and certifications in Section N. The notice does not promise expedited handling or approval for every application.
What should I check before filing a RAP application?
Use the current form and instructions. Confirm the applicable media components, complete the relevant certifications, coordinate required signatures, and reconcile the application with the RAR and required attachments. Explain any variance or professional-judgment issue clearly in Section O.