Envicon Group
Water, Stormwater & Dewatering

Stormwater Infrastructure Gets a D in ASCE’s 2025 Report Card

envicongroup_wwra53

Environmental & Civil Engineering Consultants

August 11, 2025
3 min read

The American Society of Civil Engineers (ASCE) has released its 2025 Report Card for America’s Infrastructure. Stormwater systems earned a D—one of the lowest marks on the list. For New York and New Jersey, where dense urban landscapes and aging systems are the norm, this is more than a statistic. It’s a direct call to action for the environmental engineering sector.

While the national infrastructure grade improved modestly to a C, stormwater lags behind, keeping company with roads and public transit as some of the nation’s weakest links. In our region, outdated infrastructure meets intensifying storms and tighter regulations, compounding risk for developers, property owners, and commercial stakeholders.

Why Stormwater Systems Are Failing—and the Role of Environmental Engineering
Most stormwater infrastructure in NYC and NJ was built for a bygone era—one with smaller buildings, less pavement, and more predictable rainfall. Today, climate change and urbanization are rewriting the rules:

  • Full-Spectrum Site Civil & Environmental Engineering
    • Our team produces DEP/NJDEP-compliant drainage plans, stormwater detention and retention systems, and advanced storm sewer layouts—optimized for even the tightest sites.
  • Permitting and Regulatory Guidance
    • We navigate the entire regulatory process, from SWPPP and MS4 filings to FEMA coordination, leveraging up-to-date local and federal requirements to minimize risk and streamline approvals.
  • Future-Ready, Resilient Design
    • Using current rainfall data, climate forecasts, and floodplain modeling, we engineer systems that exceed minimum code and perform under evolving climate scenarios.

High urban density exacerbates these problems. Tight footprints, utility congestion, and overlapping jurisdictions turn every drainage improvement into a technical and regulatory puzzle. Stormwater Is an Environmental, Financial, and Legal Risk—All at Once. Stormwater risk is woven through the entire project lifecycle. Poor planning leads to delayed permits, redesigns, change orders, and potential fines from federal, state, and city agencies. Whether you’re developing a commercial property, repositioning a brownfield, or upgrading an existing site, a weak stormwater strategy can undermine project viability and long-term value.

Envicon’s Environmental Engineering Approach: Raising the Grade in Stormwater
At Envicon Engineering, stormwater management is a core discipline—anchored in environmental engineering and real-world constructability. We work with clients in the private sector to deliver integrated, compliant, and resilient solutions tailored to the unique challenges of New York and New Jersey.

Delivering Solutions That Protect People, Projects, and the Environment
The ASCE’s D-grade isn’t just about infrastructure—it’s about public health, business continuity, and regional resilience. In rapidly changing markets like Hudson County, Brooklyn, and northern NJ, environmental engineering is now central to successful development and compliance.

Our philosophy: Don’t just draw plans—engineer solutions that work for decades, not just during construction.
Build Smarter. Build Resilient. Build with Envicon.

Stormwater systems protect more than property; they anchor public safety, regulatory compliance, and economic vitality. The D-grade reflects what happens when environmental risks go unaddressed. At Envicon, we turn that risk into opportunity—through technical leadership, regulatory expertise, and hands-on collaboration.

If your next project involves site development, land disturbance, or new construction in New York or New Jersey, engage Envicon early. We’ll identify risks, fast-track compliance, and deliver a stormwater system built for the future.
Connect with our environmental engineering team to set a new standard for your site.

Stay Updated

Get the latest environmental engineering insights delivered to your inbox.

No spam. Unsubscribe anytime.

Initializing security...

Related Articles

Sediment and Waterfront Remediation NY and NJ 2026: MGP Residuals, Bulkheads, and Dredge Material Management
Remediation & Brownfields

Sediment and Waterfront Remediation NY and NJ 2026: MGP Residuals, Bulkheads, and Dredge Material Management

A waterfront parcel in Jersey City, Bayonne, Newark, Brooklyn, or Queens rarely has a single environmental problem. The shoreline may contain manufactured gas plant residuals, coal tar, PAH-impacted sediment, historic fill, buried debris, and decades of industrial discharge. The bulkhead may be structurally compromised. The seabed may require dredging or capping. Tidelands, riparian rights, wetlands, […]

Environmental Consultant Hoboken NJ: Phase I ESA, Flood, Historic Fill, and Transaction Risk
Due Diligence & Phase I/II ESA

Environmental Consultant Hoboken NJ: Phase I ESA, Flood, Historic Fill, and Transaction Risk

A Hoboken property transaction can look straightforward on paper and still carry environmental, flood, subsurface, or permitting risks that affect price, financing, and schedule. A credible environmental consultant in Hoboken NJ should do more than deliver a Phase I report. The work should connect environmental findings to the decisions you need to make before closing, […]

NJDEP REAL Legacy Period July 2027: Which Development Permits Can Still Use Pre-REAL Rules
Regulatory Updates

NJDEP REAL Legacy Period July 2027: Which Development Permits Can Still Use Pre-REAL Rules

DRAFT | Pending approval. New Jersey’s Resilient Environments and Landscapes rules, known as REAL, took effect on January 20, 2026. The rules changed requirements for coastal development, freshwater wetlands, stormwater, and flood hazard areas. NJDEP originally created a 180-day legacy period ending July 20, 2026. The Department later proposed extending […]

SWPPP Permit Newark NJ: Construction Stormwater Readiness for Industrial and Multifamily Sites
Water, Stormwater & Dewatering

SWPPP Permit Newark NJ: Construction Stormwater Readiness for Industrial and Multifamily Sites

A Newark construction project that disturbs one acre or more may need coverage under New Jersey’s NJPDES Construction Activity Stormwater General Permit 5G3 before land disturbance begins. The same requirement can apply to a smaller phase when it forms part of a larger common plan of development or sale. That matters for phased multifamily projects, […]

NYSDEC Part 617 Disadvantaged Community Screening: A 2026 SEQRA Checklist for NYC Developers
Regulatory Updates

NYSDEC Part 617 Disadvantaged Community Screening: A 2026 SEQRA Checklist for NYC Developers

New York’s amended 6 NYCRR Part 617 took effect on June 12, 2026. For developers, the change is direct: SEQRA review must now address whether a proposed action may cause or increase a disproportionate pollution burden on a disadvantaged community. That analysis belongs in the environmental review record. It can […]

Need Expert Guidance?

Our team can help you navigate complex environmental challenges.